Laserfiche WebLink
<br />. .", . (\~ 'owk~~tIl <br /> <br />" Office this activity wIll be considered out of scope and may impact the sChedur{ The State <br />CRDSS management team will also provide written conunenls on the draft task memo and resolve <br />how to handle Task 3.03 review conunents from the Division Engineer which may conflict with <br />State CRDSS team's conunents. The State will complete their review of the memo within one <br />week of receiving the Division Engineer's conunents. Boyle will finalize the Task memo within a <br />week of receiving the State's comments, <br /> <br />Deliverables: <br />I, Boyle: Grouped diversion structures located on a map, <br />2. Boyle: Confirmation that structures to be aggregated occur in only one aggregated group, <br />3, Boyle: Draft ArcView generated hard copy map and files showing aggregated groups of structures <br />and irrigated lallds, <br />4. Boyle: A swnmary of.crop type~ for each aggregated group. <br />S. Boyle: A final ArcView generated hard copy map and files showing aggregated groups of <br />structures and irrigated lands, <br />6. Boyle: Draii Task memorandum 3,03 for review, <br />7. Boyle: Final Task memorandum 3.03 incorporating swnmary of meeting with Division Engineer. <br /> <br />Task 3.04 <br /> <br />Add Aggregated Structures to Network <br /> <br />. <br /> <br />Objective: Add aggregated structures to the network. lbis includes the aggregated irrigation structures <br />identified ill Task 3,03, the aggregated M&I structures identified in Task 3,10, the aggregated <br />reservoirs and stock ponds identified in Task 3.11 and the instream reach information identified in Task <br />3,12. <br /> <br />Prerequisite: STATE review of Task 3.03. Completion of Tasks 3.10, 3.11 and 3.12. <br /> <br />Approach: <br /> <br />I. Boyle: Revise the DM! makenet input file (* .net) to include the aggregated irrigation structures <br />identified in Task 3.03, the aggregated M&I structures identified in Task 3.10, the aggregated <br />reservoirs and stock ponds identified in Task 3,11 and the instream reach information identltIed in <br />Task3,12. <br />2, Boyle: Run makenet ~o generate a line diagram showing the aggregated structures, a revised base <br />flow file (*. rib), a revised river network file (*-rin), and a revised river station file C* .ris). <br />3, Boyle: Prepare a memorandum containing approximately 2 pages of text swnmarizing the results <br />of this Task and any concerns identified, <br /> <br /> <br />Deliverables: <br />I. Boyle: A revised model network file (*-net), river network file C * .rin), base flow file (*-rib) and <br />river station file C* ,ris) that reflect the aggregated irrigation structures added. <br />2. Boyle: An 8.5"xll" line diagram of the new model network. <br />3. Boyle: Task Memorandum 3.04, swnmarizing the results of this Task. <br /> <br />1160 <br /> <br />Phase Ill. Scope of Services <br /> <br />A.24 <br /> <br />1.n31,1997 <br />