My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC00174
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSPC00174
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:48:21 AM
Creation date
10/9/2006 1:59:43 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Basin-Colorado River Computer Models-Colorado River Decision Support System
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
7/3/1996
Author
Leah Lewis
Title
Jean Van Loan Contract-Memorandum-Water Rights Conversion Scope of Work
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.' <br /> <br />( <br /> <br />.' <br /> <br />MEMORANDUM <br /> <br />To: <br />From: <br />Date: <br />Subiect: <br /> <br />Ross Bethel, Will Burt and Kathi Daugherty <br />Leah Lewis <br />July 3, 1996 <br />Water Rights Conversion Scope of Work <br /> <br />Our intention is to hire J ean Van Loan as a contractor to perform the conversion of <br />DWR's Water Rights from dBASE into Informix, This memorandum explains in detail <br />the Scope of Work, the deliverables, and the deadline of this project. <br /> <br />There are six topics that will be covered in this Scope of Work; Desired Results, <br />Guidelines, Resources, Accountability, Consequences, and Schedules, <br /> <br />Desired Results <br /> <br />Jean will be tasked with converting the dBASE water rights records into the HydroBase <br />Design, for the West Slope Divisions (Divisions 4, 5, 6, and 7), Then she will use these <br />data to produce 2 tables of information that will be incorporated into the CROSS <br />database, <br /> <br />Therefore the four deliverables to the CROSS Project Manager are: <br /> <br />1. <br />2, <br />)3 <br />4, <br /> <br />Derived Net Amounts Table ./ A",-"\\ f~'-- '\<>-\\e- <br />Derived Transactions Table ~ <br />Routines to produce the Derived Tables "'-'> ~~o\....,' \.. C~. <br />Documentation <br />. Procedures manual - "how to load the database", and "how to load the derived <br />tables" <br />. Developer's manual - "how the database conversion was performed", how the <br />derived tables were produced" <br /> <br />Since CROSS relies on DWR's ability to provide these tables with current data, Jean must <br />also provide to DWR the ability to reproduce her work. <br /> <br />.' <br /> <br />0250 <br />
The URL can be used to link to this page
Your browser does not support the video tag.