Laserfiche WebLink
<br />OGJ~97 <br /> <br />utilized by the Grand Mesa Project. <br />consist of surplus flovs of Ward and <br />reservoir through the potential Ward <br />Canals. <br /> <br />The replacement supply would <br />Surface Creeks diverted to the <br />Creek and Fruitgrowers Feeder <br /> <br />Existing irrigation ditches would be used to convey supplemental <br />project water to. lands that are now irrigated. The ditch owners <br />vould rehabilitate or enlarge the ditches where necessary. The <br />project vould provide distribution laterals for lands not presently <br />irrigated. Land drains would be provided as needed. <br /> <br />PROJECT FEATURES <br /> Gr and Electric Cactus <br /> Mesal/ . Mountain Park <br />Reservoirs <br />Capacity (acre-feet) <br />Active 0 25,000 25,000 <br />Dead and inactive 5,000 2,000 4,000 <br />Total 5,000 27,000 29,000 <br />Normal water surface area <br />(acres) 675 448 38.7 <br />Dams <br />Heigh t (feet) 214 210 <br />Crest length (feet) 1,740 3,315 <br />Crest width (feet) 30 30 <br />. Type earth and rolled <br /> rockfill earth <br /> <br />Canals <br /> <br />Length <br />(miles) <br />43,1 <br />10.2 <br />7.7 <br />4.4 <br />1.3 <br />2.1 <br />6.1 <br />of reservoirs <br /> <br />Grand Mesa <br />Cedar edge <br />Surface Creek Feeder <br />Ward Creek Feeder <br />Fruitgrowers Feeder <br />Electric Mountain Feeder <br />Lover Redlands Lateral <br />l/Estimates for stabilization <br />Grand Mesa. <br /> <br />2 <br /> <br />(sec. -ft.) <br />Terminal <br />400 <br />50 <br />200 <br />10 <br />20 <br />100 <br />15 <br />selected on <br /> <br />~ <br /> <br />Capacity <br />Initial <br />200 <br />235 <br />75 <br />5 <br />20 <br />20 <br />60 <br />to be <br /> <br />l- <br />f <br />I <br /> <br />, <br /> <br />[: <br />