My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC00104
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSPC00104
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 7:34:04 AM
Creation date
10/9/2006 1:57:25 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8408
Description
River Basin General Correspondence
Date
1/1/3000
Title
Fourteenth Annual Report, Pathfinder Irrigation District
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. . <br /> <br />""0.0 112 3 <br /> <br />35 <br /> <br />.. <br />411 - Water Control Strudtures - This year 78 structures were built using 275 <br />Cu. yds, of concrete and 92 tile. <br /> <br />. <br /> <br />Smith <br />High Line <br />Damaree <br />Lake Area <br />Nursery <br />McPherson <br />Bender <br />1939 Total <br />Previous <br />Report <br />Total To <br />Date <br /> <br />.. <br /> <br />:Underdr'n: : Par- :Conc-: <br />: .Culverts: :shall-: : :Man-:rete : Tile <br />:T.O.:Cks.: Siphons :Flume:flumes:Welr:Drop:hole:Ou.Yd:15":18":241:36":RR <br />2 1 3 1 34 45: 4 <br />1 1 1 4 11: : <br />1 : 7 3 <br />1 1 : 4 9 <br />1 <br />29 <br />1 6 <br />o 275 <br /> <br /> 7 <br /> 1 <br /> 4 3 <br /> 8 12 <br />:1 23 <br />:55 50 <br />. <br />. <br />:71 7') <br /> <br />1 <br /> <br />1 <br /> <br />2 <br /> <br />9 <br /> <br />4 <br /> <br />: 1 <br />56: 21: 15: 0 <br /> <br /> <br />4 <br /> <br />2 <br /> <br />17 <br /> <br />14 <br /> <br />1 <br /> <br />5 <br /> <br />60 <br /> <br />8 27 775 31: 19: 8: 17: 4 <br /> <br />27 <br />29 <br /> <br />14 <br /> <br />34 <br />48 <br /> <br />. <br />9 27 :1050 87: 40: 23: 17: 3 <br /> <br />77 : 19 <br /> <br />404 - Barth Excavation - 61,777 Cu, Yds. of earth was moved in the construc- <br />tion of the linings, structures, and relocating a section of 24-main for lining <br />next year, A total of 118599 cu, yds. have been excavated by the camp to date. <br /> <br />407 - Rock and Gravel Rip-rap - This year 20033 sq. yds of ditch bank have <br />been rip-ra~ed bringing the camp total to 66289 sq, yas. <br /> <br />1012 - Quarring rock and placing in stock piles for later use. This year 923 <br />WQ. yds. of rock have been quarried and placed in stock piles at Lake Alice and <br />Lake Minatare Dams. <br /> <br />.. <br /> <br />1023 - Surveys - This ""rk is done in connection with the lining of 1haterals <br />and construction of'water control structures. A total of 84,7 miles of surveys have <br />been made this year. <br /> <br />120 - Observation Tower, Bathhouse and Picnic Shelter. <br /> <br />This combination building is built of native rock and reinforced concrete <br />and designed to look like a lighthouse, The site, being out ~n the long point of <br />land extending into the lake lent itself well for this type of building, The floor <br />plan is in the shape of a cross with four wings projecting from the central t~wer <br />unit, Two of these wings arc used as bathhouse dressing rooms and the other two <br />as semi-open picnic shelters, The tower rises 55 feet and the observation floor at <br />the top is reached by a circulRr reinforced concrete stairway. The building was <br />comple~d ~nis year. Landscaping of the area has been started and will be continued <br />in 1940, <br />
The URL can be used to link to this page
Your browser does not support the video tag.