Laserfiche WebLink
<br />.. '.':001121 <br /> <br />"~r-~~" ...,...,. .' <br /> <br />33 <br /> <br />After the end of the irrigation season the water is drained out of <br />the syphons and th~t part too low to drain is then pumped out, During the <br />past ye~r \~ter was pumped out of 16 syphons, <br /> <br />, <br /> <br />A l~rge p~rt of the spring and fall cleaning is still done with teams, <br />during 1939J six miles of the High Line, 8 miles of the Low Line Can~l and <br />175 miles of lateral were cle~ned with teams, The use of teams gives the <br />w~ter user an opportunity to work out a part of his operation and maintenance <br />ch~rges, 70,75 miles of laterasl were cleaned with the Ruth Machine, <br /> <br />" <br /> <br />The laterals below the drops are continually eroding and have to be <br />rip-raped with rock or broken concrete, These repairs will have to continue <br />from ye~r to year until the lateral section below each drop on the project is <br />protected, <br /> <br />The syphon on lateral #108 become plugged with weeds and blow sand <br />during the winter months and every effort to get the w~ter through the syphon <br />was unsuccessful unti~ a hole was drilled through the syphon at it lowest part, <br /> <br />The weeds th~t blow into the canal and lat~rals and those along the <br />banks that might interfere, ~rc burned e~eh spring befor~ water is turned into <br />the ditches, During 1938 the weeds were burned from 129,5 miles of canal and <br />232 miles of lat,_rals, During the non-irrig"-tion se~son the crews go over the <br />Main Canal frequently and burn the weeds that have blown in, otherwise they <br />would be covered with drifting sand and would form mounds in the canal,' <br /> <br />'/ <br /> <br />The timber headgates and weir crests .~.re being re::-l".ced with met'll <br />g~tes and crests, During the PQst year, 104 mot~l headg,,-tes and 57 metQl <br />crests were installed, The he'cdgotes and crests are mQde in the District shops, <br /> <br />^ list of all structures on which work was performed is as fJllows: <br /> <br />Structures constructed, replaced or rep'lired <br />New turnouts complete <br />Timber he~dg~tes rep'lircd <br />Headg'lte structures repaired <br />New Steel G tes <br />New Steel ,ieir Crests <br />New "eir Structures <br />New '!.cir Structures repaired and r0pl''lced <br />New Drops <br />Drops rc~ aired and re:'laced <br />New Checks <br />Checks rep'lired <br />New Flumes <br />Flumes re;xl',red <br />Sy~hons repaired <br />Ro~d crcJssings repaired <br />Ro~d crossings re;,l:-.ced <br />New Bridges <br />Bridges rep'lired <br />Dutch Riders Crossings <br />M~n holes in drains <br />Auto G!l.tes New <br /> <br />4 <br /> <br />during 1939, <br />4 <br />3 <br />4 <br />104 <br />57 <br />9 <br />12 <br />9 <br />45 <br />16 <br />29 <br />1 <br />2 <br />4 <br />11 <br />36 <br />1 <br />13 <br />9 <br />3 <br />16 <br />378 <br />