Laserfiche WebLink
<br />- ~;:JI.T- - - <br /> <br /> TABLE XV-3 <br /> PRELIMINARY DESIGN LEVEL <br /> CONSTRUCTION COST ESTIMATE <br /> ULTIMATE EXPANSION <br /> (2000 - Subphase t. 10 mgd Initial) <br /> (2010 - Subphase II. 10 mgd Expansion) <br /> (2020 - Subphase m, 10 mgd Expansion) <br /> 30 mgd Total <br />Summary Description EstJmated Cost <br />Subphase I Initial 10 mgd Treatment Capacity $18,330,000 <br /> TransmiSSIOn 4,600,000 <br /> Storage - 10 mg 1.800.000 <br /> Beester Pumping 50.000 <br /> Subtotal $24.780.000 <br /> EngJneering. Legal. Administrative @ 15% 3,717.000 <br /> Allow Contingencies @ 20% 4.956,000 <br /> Total (2000 $) $33.453.000 <br /> Use $33,450.000 ~ <br />Subphase II 10 mgd Expansion (2010) $ 7.260.000 <br /> EngJneering. Legal. Administrative @ 15% 1.089.000 <br /> Allow Contingencies @ 20oA> 1.452.000 <br /> Total (2010 $) $ 9.801.000 <br /> Use $ 9.800.000 <br />Subphase ill 10 mgd Expansion $ 9.240,000 <br /> EngJneering. Legal. Administrative @ 15% 1,386.000 <br /> Allow Contingencies @ 20% 1.848.000 <br /> Total (2020 $) $12,474.000 <br /> Use $12,474.000 <br /> GRAND TOTAL $55,724.000 <br /> <br />JOHN CAROLLO <br />ENGINEERS <br /> <br />4.3 <br /> <br />P3302:DM OQl'.I':ucutM! Summey .3(90 <br />