Laserfiche WebLink
<br />lIT70/16 <br /> <br />TABLE XV-2 <br />PRELIMINARY DESIGN LEVEL <br />CONSTRUCTION COST ESTIMATE <br />INITIAL EXPANSION (1994) <br />40 MGD SUSTAINED CAPACITY <br />(1994 $) . <br /> <br />SUMMARY <br /> Item No. Description Estimated Cost <br /> l. Chemical Systems <br /> Chlortne Sterage $ 380.000 <br /> Chlortne Feed Room l61.ooo <br /> Stabilizer/Ac1d System 192.ooo <br /> Filter Aid System 40.000 <br /> 2. Ex:1sting F1occulation/SedJmentation <br /> Basins UpgradJng 474.000 <br /> 3. New F1occulation/SedJmentation Basins 2.169.000 <br /> 4. New Filters 3.304.000 <br /> 5. Clearwell 603.000 <br />~ 6. Sludge Handling System l.3l0.ooo <br /> 7. 750 KW Generator Installation 275.000 <br /> 8. Yard Piping 575.000 <br /> 9. Metering Vaults 60,000 <br /> lO. Canal Intake Structures 418.000 <br /> ll. High Service Pump Station 2.475.000 <br /> l2. Architectural Treatment at Maln Street <br /> Water Treatment Plant 50.000 <br /> 13, Additional 30-inch System Transmission <br /> Piping 206,000 <br /> 14, Additional 3.0 mg Storage 1,100.000 <br /> 15. Additional Booster Capacity at 16th Street 100.000 <br /> Subtotal $l3.892.000 <br /> Engineering. Legal. Administration @ 15% 2.084.000 <br /> Allow for HJstorical Preservation Site 250.000 <br /> Allow Contingencies @ 20% 2.779.000 <br /> TOTAL $19.005.000 <br /> USE $19,000.000 <br />42 <br />P3-'Q1.:DW DIP'.F.xec'l.lOY'C SUDmUD"f 3/90 <br />