My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01729
CWCB
>
Loan Projects
>
Backfile
>
3001-3102
>
PROJC01729
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2010 11:11:25 AM
Creation date
10/6/2006 12:27:30 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153754
Contractor Name
Southeastern Colorado Water Conservancy District
Contract Type
Grant
Water District
0
County
Lake
Chaffee
Fremont
El Paso
Bill Number
SB 99-173, SB 96-170
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />. <br /> <br />STATE OF.COLORADO <br /> <br />- <br /> <br />, <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />721 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Phone: (3031 866.3441 <br />FAX: (303) 866,4474 <br /> <br />Roy Romer <br />Governor <br /> <br />MEMORANDUM <br /> <br />lames S. Lochhead <br />Executive Director, DNR <br /> <br />Deuies C. Ule. P.E. <br />Director, eWeB <br /> <br />(upDATED December 26, 1996) <br /> <br />TO: Colorado Water Conservation Board Members <br /> <br />FROM: John Van Sciver <br /> <br />DATE: November 13, 1996 <br /> <br />SUBJECT: Agenda Item 18f., November 25-26, 1996, Board Meeting-- <br /> <br />Southeastern Colorado Water Conservancy District. <br />Approval of a Feasibility Study Grant in amount of $75,000 to Conduct a <br />"Water and Storage Future Needs Assessment", for the Arkansas River <br />Basin. <br /> <br />BACKGROUND <br /> <br />The Southeastern Colorado Water Conservancy District (SECWCD) has submitted a request for <br />a grant as partial funding of a Water ~d Storage Future Needs Assessment for the Arkansas <br />River Basin, They are requesting a grant of $75K, ,approximately 38% of the total estimated <br />study cost of $200K, <br /> <br />Over the past several years, the CWCB Director, as well as the State Engineer, have been <br />attending meetings of the Arkansas River Coordinating Committee, These meeting were <br />attended by the majority of water interests in the Arkansas basin, and were an outgrowth of the <br />Kansas/Colorado lawsuit and the need to fully regulate junior wells in the basin, New S,E.O. <br />rules have been implemented, and several well augmentation associations have taken steps to <br />acquire permanent water rights for well augmentation purposes, <br /> <br />With some of the near term issues resolved, SECWCD set up a Storage Study Committee to <br />look at long term projections for the Valley, They have conducted meetings, and surveyed water <br />users within District boundaries, A significant question is weather there will be sufficient water <br />in the basin to satisfy all projected water needs, <br />
The URL can be used to link to this page
Your browser does not support the video tag.