Laserfiche WebLink
<br />water. The current study is an attempt to increase the benefits of the Dolores Project by <br />providing: additional water for wildlife/instream flow below McPhee Dam and other <br />environmental and recreational enhancements; additional irrigation water to arable dry land <br />that was not served originally; marketing of municipal and industrial water that the <br />community voted to keep in the area; as well as other benefits that may arise during the <br />course of the study, <br /> <br />The Dolores Water Conservancy District's (DWCD) WET PACK feasibility study will <br />identify water needs and water sources, formulate alternative facilities to develop and <br />deliver the water, select a preferred plan, prepare feasibility level designs, and describe the <br />financial plan, The feasibility study may include all water sources and uses within or <br />adjacent to the DWCD boundaries. Specifically, the study will determine, at a minimum, <br />if a feasible project can be developed to provide additional fish water below McPhee Dam <br />and increase the irrigated acreage in the project area, In conjunction with those two needs, <br />additional needs will also be evaluated and included if feasible, <br /> <br />Preliminary evaluations conducted prior to the feasibility study and documented in the <br />Reconnaissance Report, indicate that a financially feasible plan can be developed but will <br />be dependent upon agreements with involved water users and entities, The negotiations <br />will be part of the study, in addition to the technical and financial analysis, <br /> <br />STUDY SCHEDULE AND BUDGET <br />The study is expected to require about two years to conduct, with a request for a loan for <br />construction from the Colorado Water Conservation Board (CWCB) anticipated in the fall <br />of2000 for inclusion in the FY2002 budget (beginning July, 2001), The feasibility report <br />is scheduled to be completed by September of2000. <br /> <br />The study is expected to cost a maximum of $250,000 based upon present information, <br />The budget is attached as Table I and shows the estimated' cost of the tasks and sub-tasks <br />described in the "Preliminary Scope of Work" section, As the study progresses funds <br />budgeted in one task may be moved to other tasks, as necessary, <br /> <br />STUDY TEAM <br />The DWCD will conduct the study using a team of in-house staff and consultants. The <br />DWCD has a staff of about 20 people including the General Manager, an operation~ <br />manager (who is an engineer), secretaries, bookkeeper, equipment operators, electricians, <br />technicians, and other staff, <br /> <br />The project manager of the study will the District General Manager, John Porter. Steven <br />Harris of Harris Water Engineering, Inc, will be the study technical coordinator for all of <br />the technical evaluations and preparation of the feasibility report. The law firm or Maynes, <br />Bradford, Shipps, and Sheftel will provide legal services. An advisor to the project <br />manager will be selected to provide oversight to the entire study and review critical aspects <br />such as: is the study on track, are funds effectively spent, are the important issues <br />addressed, are investigations conducted in a credible manner, is the recommended project <br />workable from technical and financial perspectives. <br /> <br />Page 2 12/30/98 F;oohn\memo\WETPACK SCOPE OF WORK.doc <br />