Laserfiche WebLink
<br />, <br />.,e- <br /> <br />. <br /> <br />., <br /> <br />, <br /> <br />t <br /> <br />Task 11: <br /> <br />Draft Feasibility Report <br /> <br />A draft Feasibility Report will be prepared for submittal at the completion of Task 10, <br />which summarizes all findings and recommendations from the previously completed <br />tasks. The report win present the current understanding of fish culture techniques for <br />the endangered fishes and will present the information on the feasibility of <br />constructing and operating a fish hatchery in Colorado for the propagation and study <br />of the endangered fish. Recommendations, preliminary design configuration, and <br />estimated costs for the hatchery will also be presented. <br /> <br />Task 12: <br /> <br />Final Feasibility Study <br /> <br />A final Feasibility Report will be prepared which will incorporate comments by the <br />CWCB and Technical Advisory Committee on the draft Feasibility Report. The final <br />Feasibility Report will be submitted within 30 days of receipt of comments from the <br />CWCB. <br /> <br />GENERAL <br /> <br />All reports will be prepared in Word Perfect and submitted on 8 1/2 X 11 paper, bound with <br />II comb binding. Tables and graphs will be prepared using Lotus 1-2-3 or MacIntosh software. <br />Fun size plans win be prepared on mylar using AutoCAD software and manual drafting <br />methods, <br /> <br />20 <br />