Laserfiche WebLink
<br />; <br /> <br />. <br /> <br />. <br /> <br />~~ <br /> <br />~ <br /> <br />. <br /> <br />Task 10: <br /> <br />Issues aDd Permits <br /> <br />Objective: <br /> <br />To outline and briefly describe the technical and biological issues that the State <br />and the Recovery Implementation Program will need to address before a <br />hatchery can be built. Permits which will be required for construction and <br />operation of the hatchery shall be listed, <br /> <br />Responsibility: All. <br /> <br />Methodology: <br /> <br />1. The objectives of Tasks I through 9, to be accomplished through this study, <br />include the identification and analysis of the biological and technical issues <br />which will determine the feasibility of a hatchery and the hatchery site. These <br />issues will be consolidated and summarized as part of this task. <br /> <br />2. The biological and technical issues which fall outside the scope of the feasibility <br />study tasks, but which must be addressed in order to construct or operate the <br />facility, will be determined by contacting Federal, State and Local agencies for <br />permits and licensing information concerning: <br /> <br />a. Zoning <br />b. Construction and architecture standards <br />c. Siting requirements <br />d. Operational issues <br />e. Maintenance issues <br />f. Wastewater discharge <br />g. EPA requirements <br />h. Endangered Species Act <br />i. Disease certifications. <br /> <br />Work Products: <br /> <br />1. A list and summary issue descriptions from Tasks I . 9. <br /> <br />2. A list and descriptions of issues related to construction and operation of a <br />hatchery. <br /> <br />3. A list and descriptions of permits and licenses required to site and operate the <br />facility. <br /> <br />4. An overall flow chart of permitting and licensing requirements. <br /> <br />5. A Task Report documenting the above. <br /> <br />19 <br />