My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01584
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
PROJC01584
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:44:25 AM
Creation date
10/6/2006 12:25:59 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153576
Contractor Name
URS Consultants
Water District
0
County
Mesa
Bill Number
Sb 89-85
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />~ <br /> <br />Deliverables <br /> <br />The Contractor shall provide the number of copies indicated <br />of each of the following: <br /> <br />1. A report at the end of each task. <br /> <br />(6 copies) <br /> <br />2. Draft final report (Task 11). (6 copies) <br /> <br />3. The final report (Task 12). (15 copies. plus unbound text <br />originals) <br /> <br />4. Such visual aids reproduced from previously prepared <br />materials as necessary for meetings of the Board and <br />Recovery Management and Implementation Committees as the <br />State may request. <br /> <br />Study Schedule <br /> <br />The Contractor shall carry out the study according to the <br />attached schedule (Figure I). This study schedule is <br />contingent upon the timely review and input of others. <br /> <br />Study Costs <br /> <br />The Contractor shall carry out the specified tasks for the <br />costs and hours presented in the attached Tables 1 and 2 of <br />this exhibit. Any changes to these schedules must be in <br />accordance with paragraph 9 of this contract. <br /> <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.