Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />Geotechnical investigations were performed by Kumar & Associates, Inc, (Kumar), on Dam <br />No, 4 In 1990, These Included excavation of several test ptts, construction of four exploratory test <br />holes adjacent to the outlet conduits; and together wtth Wheeler, a full length inspection of the <br />interior of the outlet condutts and the reservoir control gates, Drill (test) holes were extended into <br />bedrock and cased wtth slotted PVC pipe for continued use as piezometers, The water level in the <br />lower piezometers was found to be about 22 feet below the crest of the embankment fill, <br />corresponding to elevation 3695, This level corresponds to a layer of sand and gravel which was <br />revealed during the test hole drilling. The reservoir level at the time of measurement was elevation <br />3706, <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />A report prepared by the State Engineer describes the condttions of the outlet condutt and <br />control gates, This report is presented in Appendix H, The geotechnical report for Dam No, 4, <br />prepared by Kumar Is presented in AppendiX I. <br /> <br />. <br /> <br />Mapping at a scale of 1.0 inch to 100 feet has been prepared for all four dam embankments, <br />The mapping was prepared from aerial photographs dated May 1987, A 1-inch to 20-feet scale map <br />has been prepared for Dam No, 4 in the vicinity of the outlet works, This map was based upon the <br />May 1987 aerial photography mapping and supplemented with ground data points from a 1990 field <br />survey. <br /> <br />. <br /> <br />Desian <br />Several alternate design concepts for the outlet condutt and Dam No, 4 repairs were <br />evaluated, The alternatives ranged from relining the outlet conduits with shotcrete, rebuilding the <br />control gates and installing a filter blanket and stabilizing berm on the embankment (Alternative A), <br />to a complete replacement of the outlet condutt, control tower, gates, and adjacent embankment <br />fill (Alternative F), The major features of the various alternatives are described in Table 10, <br />Generally speaking, Alternatives A, Band C focus primarily on repair of existing faciltties while <br />Alternatives 0, E and F focus on major component replacement. Construction quanttties and order <br />order-of-rnagnttude cost estimates were prepared which address the major components in each <br />alternative. These are presented in Tables 11 and 12 for Alternatives A, B, C and 0, E, F, <br />respectively. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />15 <br /> <br />. <br />