My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153604 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
C153604 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2009 9:26:17 AM
Creation date
10/6/2006 12:25:14 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153604
Contractor Name
Julesburg Irrigation District
Contract Type
Loan
Water District
64
County
Logan
Bill Number
SB 86-27
Loan Projects - Doc Type
Feasibility Study
Supplemental fields
Water Division
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />CHAPTER V <br />PLAN OF DEVELOPMENT <br /> <br />. <br /> <br />Phvsical Plan <br />Julesburg Reservoir consists of a 28,200 acre-foot reservoir retained by four major earth <br />dam embankments and one minor embankment. These embankment fills range in vertical height <br />from 15 feet to about 65 feet, and total about 8,600 feet In length, The outlet structure for the <br />reservoir is located on Dam No.4 and delivers water directly Into the HighllneService Canal. The <br />existing outlet consists of a three-conduit concrete arch tunnel, 150 feet In length, with three cast <br />iron control gates in a tower structure located about 90 feet from the Inlet structure, The <br />embankment fill height at the outlet works Is about 33 feet. This outlet structure dates to the original <br />dam construction In 1904, The general layout of the JUlesburg Reservoir dam embankments are <br />shown In Figure 1, <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />Since 1984, Julesburg Irrigation District has been investing in the rehabilitation of the <br />Julesburg Reservoir dams, On both Dam Nos, 2 and 3, toe drain systems, filter drainage blankets, <br />and earth-fill stabilizing berms have been installed, These Improvements control embankment and <br />foundation seepage, and Improve the slope stability of the earth-fill embankments, Similar repairs <br />are recommended for Dam Nos. 1 and 4, but of a much reduced scope, It Is believed these repairs <br />can be performed by District personnel as routine maintenance Items. The outlet works require <br />extensive repairs or rehabilitation to ensure water tightness and structural integrity, This chapter <br />describes the proposed rehabilitation measures to be performed with the CWCB Construction Fund <br />loan, <br /> <br />. <br /> <br />. <br /> <br />It is the District's proposal to completely replace the outlet structure, Including the conduits, <br />gate control tower, and control gates, and also the embankment fill adjacent to the outlet (a portion <br />of Dam No, 4), The concrete In the existing conduits is old and shows signs of severe deterioration, <br />including areas of very soft concrete, fractures and cracks, seepage and areas of exposed <br />reinforcement. The control gates show considerable leakage, one is slightly bent, and the overall <br />Integrity for long-term future use Is unknown. A report prepared by the State Engineer, summarizing <br />an October 13, 1990 Inspection of the outlet conduits is enclosed in Appendix H, The proposed <br />repair measures are shown in Figure 4, located at the back of this report, <br /> <br />. <br /> <br />. <br /> <br />13 <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.