My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01503
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
PROJC01503
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:25:36 AM
Creation date
10/6/2006 12:23:00 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153829
Contractor Name
Eagle Park Reservoir Company
Contract Type
Loan
Water District
37
County
Eagle
Bill Number
SB 96-153
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />. <br /> <br />J I <br /> <br />[ '/t <br />1/ "or' <br /> <br />~~~, <br />I <br /> <br />I <br />pit" <br />,V' <br />I <br /> <br />J <br />/ <br /> <br />'7 <br />I <br />, <br /> <br />I- <br />demand in the next 10 vears ranges from 4.600 to 5.400 af/vr. This amount of <br />. ..... . <br />water is needed to provide for the necessary domestic and snowmaking uses. while <br />preserving and protecting the decreed instrcam flows. The demand for additional <br />water increases to 10.500 acre feet at full build-out conditions. A copy orlhe table <br />from the Eagle River Assemblv report which summarizes the eStimated water V <br />~. -- <br />demands is attached hereto as Exhibit II. <br /> <br />The central feature of the project which the loan applicants seek to acquire and <br />develop is Eagle Park Reservoir. Originally known as Dam 4. Eagle Park <br />Reservoir is an existing facility de\'clopcd by the Climax Molybdenum Company <br />during the 1960's for the storage of tailings. The capacity of the facility is in <br />excess of 3000 acre fect and the reservoir is located adjacent to an unnamed <br />tributary of the East Fork of the Eagle River. It is within the boundaries of tile <br />Climax Mine and is situated in Eagle County. General area maps of Eagle Park <br />Reservoir arc attached hereto as Exhibits f and G, <br /> <br />In 1993 Vail Associates purchased from Climax 500 acre feet of the Arkansas <br />\Vell and related storage rights. This is the state's only east to west slope <br />transmountain diversion and is depicted on the attached Exhibit F. The funds rron~ <br />this sale were used to reclaim Eagle Park Reservoir and. as part of the Arkansas <br />I \\-rcll transaction. Vail Associates acq-uir;;d ml option to purchase 600 acre feet of <br />the liml annual yield of Eagle Park Reservoir. Vail Associates also obtained the <br />right to exchange its 500 acre feet of Arkansas Well water for an additional 500 <br />_ acre feet ofwatcr in Eagle Park Reservoir. 'r ,. -',.., -::;. ;/ <br /> <br />n <br /> <br />-1,,;",-: <br /> <br />Over the past year. Cyprus Climax Metals Company. the new owner of the Climax <br />Mine. has made substantial progress in reclaiming Eagle Park Reservoir. Current <br />projections arc for the reclamation to be completed in late fall of 1995 or early <br />spring of 1996, <br /> <br />In the vicinity of Eagle Park Reservoir is Robinson Lake (see Exhibit G). It is <br />another existing storage t:1cility owned by Climax which currently contains <br />tailings. Robinson Lake has a capacity of approximately 3100 acre feet. Upon <br />completion of the reclamation of Eagle Park Reservoir. Robinson Lake may also <br />be reclaimed. Upon reclamation. the project could be expanded to include this <br />facility. However. none orthe loan funds which arc the subject of this application <br />pertain to Robinson Lake, <br /> <br />~12~~~B <br /> <br />-l <br />
The URL can be used to link to this page
Your browser does not support the video tag.