Laserfiche WebLink
<br />Need for the Project <br /> <br />The LDC, with help from the CWCB, has started to develop a <br />recharge system that will generate augmentation water to be used <br />to offset the depletions caused by their 13 wells. The LOC as <br />with all ditch systems that divert water into recharge has <br />discovered the differences of running a ditch in just the summer <br />months to running a ditch almost year round. Recharge systems <br />require that the recharge ponds be filled generally during the <br />winter months and at rates less than summer diversion rates. The <br />current LOC diversion does not efficiently divert the required <br />wintertime water. The LDC would like to rehabilitate their river <br />diversion to help with these winter diversions. As a positive <br />side effect, summer diversions would also become more efficient. <br /> <br />Feasibility Study <br />towline Ditch Company <br />Diversion Structure <br />March 2003 <br /> <br />2 <br />