<br />Implementation Schedule <br /> <br />Th~ following schedule is proposed for implementation of the <br />project: <br /> <br />Task <br />~Complete Final Design <br />2. Start Construction <br />3. Complete Construction <br />4. Project is Operational <br /> <br />Date <br />01/31/03 <br />02/17/03 <br />02/28/03 <br />03/03/03 <br /> <br />Social, ~conomic, and Physical Impacts <br /> <br />The project will have no significant social impacts. <br /> <br />Although the stockholders in the LDC will be impacted with costs <br />associated with their portion of construction and loan repayment, <br />the project will have a long term positive economic impact by <br />assuring a more certain source of augmentation for their wells. <br />The LDC will also be able to reduce their assessments with GASP <br />and may have excess augmentation water available to lease for <br />financial compensation. <br /> <br />The project will have no significant physical impacts once <br />construction is complete. The recharge ponds will occupy ground <br />currently used for nothing. This ground will have setting water <br />part of the year but will return to its current appearance once <br />the water percolates back into the ground. <br /> <br />Permitting <br /> <br />All easements and rights of way are being arranged for. <br /> <br />The LDC expects to be exempt from 404 permitting. This will be <br />confirmed with the Denver District, Army Corps of Engineers. <br /> <br />Feasibility Study <br />Lowline Ditch Company <br />Recharge Project <br />December 2002 <br /> <br />9 <br />