My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01422
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
PROJC01422
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2011 2:37:07 PM
Creation date
10/6/2006 12:22:05 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150133
Contractor Name
Low Line Ditch Company, The
Contract Type
Loan
Water District
64
County
Logan
Bill Number
MC3
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Water Rights <br /> <br />There are 14 shareholders in the LDC with rights to divert 39.9 <br />cfs from the South Platte River under an 1882 decree. The <br />official name on the decree is the LOWLINE DITCH COMPANY with <br />their water being diverted down the LOWLINE DITCH. The LDC <br />diverts on average approximately 6,650 acre feet of water per <br />year through their ditch. <br /> <br />The 14 shareholders of the LDC currently have decrees on 13 wells <br />used for irrigating the 2,070 acres under their system. These <br />wells are augmented through GASP. The LDC diverts on average <br />approximately 1,200 acre feet of water per year through these 13 <br />wells. <br /> <br />Cost Estimate <br /> <br />The estimated total project cost is $105,000. <br /> <br />Item Estimated Cost <br /> <br />1. Planning and Design Costs <br />2. Construction Cost with Contingency <br /> <br />Total Cost <br /> <br />$ 5,000 <br />$100,000 <br /> <br />$105,000 <br /> <br />A more specific cost break down is as follows: <br /> <br />Item <br /> <br />Estimated Cost <br /> <br />1. Drill Aug. Well <br />2. Well and Installation <br />3. Electricity for Well <br />4. Ditch Turnout & Measurement Structures <br />5. Recorders <br />6. Dirt Work <br />7. Contingency <br />8. Planning and Design Costs <br /> <br />Total Cost <br /> <br />$ 9,000 <br />$ 15,000 <br />$ 4,000 <br />$ 24,000 <br />$ 12,000 <br />$ 21,000 <br />$ 15,000 <br />$ 5,000 <br /> <br />$105,000 <br /> <br />Feasibility Study <br />Lowline Ditch Company <br />Recharge Project <br />December 2002 <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.