Laserfiche WebLink
<br />Collateral <br /> <br />1. The LDC can offer as collateral, all potential revenues from <br />the recharge water credits generated from diverting water through <br />the structure. <br /> <br />2, The LDC can offer as collateral, the project itself. <br /> <br />Institutional Considerations <br /> <br />The LDC needs authorization to borrow $65,250 from the CWCB <br />Construction Fund. The loan, if approved, from the CWCB will be <br />contingent upon the successful negotiation of a contract between <br />the CWCB and the LDC. Agreements with contractors will be <br />finalized upon authorization of the CWCB loan. <br /> <br />Opinion of Feasibility <br /> <br />The selected alternative is technically and financially feasible. <br />There are no known roadblocks which would keep the LDC from <br />successfully completing this project. <br /> <br />Feasibility Study <br />towline Ditch Company <br />Diversion Structure <br />March 2003 <br /> <br />8 <br />