Laserfiche WebLink
<br />,,1 <br /> <br />bond at bidding. After the CWCB staff verifies that these documents comply with the <br />terms of this contract, the BORROWER may issue the notice to proceed to the <br />Construction Firms. <br />G, The BORROWER shall conduct a pre-construction conference at which time the CWCB <br />staff shall have the opportunity to review and approve the construction schedule, <br />H. If the CWCB staff determines that the PROJECT requires a resident inspector during <br />construction, the BORROWER shall employ an inspector who has been approved by <br />the CWCB staff. <br />I. The BORROWER shall construct the PROJECT in accordance with the approved plans <br />and specifications. <br />J, Upon completion of the PROJECT construction, the BORROWER shall provide as-built <br />drawings of the PROJECT to the CWCS staff, or, if required by S 37-87-105, C.R,S" <br />the BORROWER shall provide the as-built drawings to the State Engineer's Office for <br />ap.proval and ffiing.' . <br />K. Upon completion of the PROJECT construction, the, BORROWER shall arrange a final <br />inspection for the CWCB staff. <br />L. The BORROWER shall pay all of the expenses related to the PROJECT when such bills <br />are due. <br />SECTION 8 - ELIGIBLE EXPENSES. The fOllowing items are eligible for loan disbursements. <br />A. Preparing final designs and specifications for the PROJECT. <br />B. Preparing bid and construction contract documents. <br />C. Preparing environmental assessment or environmental impact statements, and <br />otherwise complying with the Federal National Environmental Policy Act. <br />D, Complying with all federal, state, and local regulatory requirements, including the <br />obtaining of all required permits. <br />E. Fish and wildlife mitigation measures required by federal, state, or local laws and <br />regulations, <br />F, Actual construction as called for in the design documents and in change orders <br />approved by the CWCB and the BORROWER, <br />G, Engineering services for construction management, including design and <br />construction management for CWCB-approved change orders. <br />H. Interest during completion of the PROJECT pursuant to Paragraph A,2 herein. <br />I. Legal services for reviewing engineering services contracts, reviewing this contract, <br />reviewing construction contract documents, and for complying with all federal, state, <br />and local regulatory requirements. <br />SECTION 9- TIME FOR PERFORMANCE <br />Project Beginning: Upon the effective date of this contract <br />Project Finish: 2 years from the effective date of this contract <br />SECTION 10 - Additional Contract Requirements <br />No additional contract requirements <br /> <br />Page 3 Df 3 <br />