Laserfiche WebLink
<br />'. <br /> <br />SECTION 5 - SCHEDUL.E OF EXISTING DEBT <br /> <br />Lienholder Contract Original Term of <br />Date Amount Repayment <br /> Loan to be repaid <br />Ray Thompson November $350,000 30 years with proceeds from <br />CWCB loan funds <br /> 1999 <br /> <br />The BORROWER obtained a loan from Ray Thompson to finance a portion of the Project <br />rehabilitation. To secure repayment of said loan, the BORROWER security agreement <br />(perfected by a (Jccr recorded with the Secretary of State 11122199 recording no, <br />657973 and a deed of trust, recorded 11/22199 in Montrose County, Reception No, <br />657972 B1016 P936-941., Proceeds of this loan shall be used to repay the Ray <br />Thompson loan. Upon full repayment of the BORROWER'S loan from Ray Thompson, <br />Ray Thompson shall record a UCC3 to release the UCC1 and a request for release of <br />deed of trust and release of deed of trust. <br />SECTION 6 - DISBURSEMENT SCHEDUL.E <br />The BORROWER shall prepare a periodic progress report which contains a statement of <br />the PROJECT costs expended for that period and shall forward said statement to the <br />CWCB, After receipt of the periodic progress report from the BORROWER, and review <br />and acceptance of the items therein as eligible expenses as described below, the <br />CWCB will pay to the BORROWER the amount set forth in the report or such portion that <br />has been approved by the CWCB. Such payment shall be made within thirty (30) days <br />from the CWCB's approval of each progress report. <br />SECTION 7 - CONSTRUCTION FUND PROGRAM PROCEDURES <br />A. The BORROWER shall employ an engineer, registered in the state of Colorado to <br />prepare plans and specifications for the PROJECT. <br />B. The BORROWER'S and the Engineering Consultant's Agreements and the plans and <br />specifications must be submitted to the CWCB stafHer verification of compliance with <br />the terms of this contract when available prior to bidding, Any modifications to the <br />plans and specifications must be approved in writing by the CWCB staff, <br />C. For plans and specifications for all juriSdictional dams and reservoirs, as defined by <br />9 37-87-105 C.R.S" the BORROWER shall provide a letter of approval from the State <br />Engineer's Office prior to construction, <br />D, CWCB staff must be present at bidding and must approve the award of the <br />construction contract. <br />E, The BORROWER shall contract for the construction of the work with responsible and <br />capable Construction Firms, which said Construction Firms shall be selected by the <br />BORROWER and found acceptable by the CWCS staff. <br />F, The BORROWER must provide a copy ,of the executed construction contract <br />documents consisting of the contractor's proposal, construction contract, <br />performance bond, payment bond, notice of award, notice to proceed, sample <br />change order, and sample field order, as well as the advertisement for bid and bid <br /> <br />Page 2 of 3 <br />