My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01372
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
PROJC01372
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:44:19 AM
Creation date
10/6/2006 12:21:37 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C010047
Contractor Name
Boyle Engineering Corporation
Contract Type
Grant
Water District
0
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />/ . <br />( . <br />, ".' <br /> <br />WHEREAS, following the. submittal of qualifications in response to a request for <br />Statement of Qualifications, the top three ranked firms participated in oral interviews, and <br />Engineer was selected as the most highly qualified among no less than three submitting <br />consultants and deemed to be the most highly qualified to perform the required professional <br />services based on factors listed in Section 24-30-1403, C.R.S.; and <br /> <br />WHEREAS, the State has formed a CRDSS Project Management Team consisting of <br />Department of Natural Resources' representatives from the Colorado Water Conservation Board, <br />Division of Water Resources, and a CRDSS Project Manager; and <br /> <br />WHEREAS, detailed scoping negotiations have occurred between Engineer and the State <br />for development activities which are addressed by this contract; and. <br /> <br />WHEREAS, Engineer shall perform services involving the practice of engineering as <br />defined in Section 12-25-102 (10), C.R.S. <br /> <br />NOW THEREFORE, it is agreed by the parties hereto as follows: <br /> <br />A. SCOPE OF SERVICES <br /> <br />The Engineer will facilitate and perform the following tasks as outlined in Exhibit A. <br /> <br />B. SCHEDULE <br /> <br />Engineer agrees to perform the services and provide work products according to the <br />guidelines set out in Exhibit A. Contract activities will be performed from the date this contract <br />is approved by the State Controller or such assistant as he may designate through June 30, 200 I <br /> <br />Engineer shall not be responsible for delays, which are due to causes beyond the Engineer's <br />reasonable control. To the extent known by the State, the State will notify the Engineer of <br />potential delays. Engineer shall notify the State in writing of any due to causes beyond <br />Engineer's reasonable control. Engineer will attempt to resolve adverse affects of any delays <br />through discussions with the State. In the case of any such delay, the time of completion shall be <br />extended accordingly through a contract amendment. <br /> <br />In accordance with Title 024-30-1404 (l), CR.S., the Consultant has executed a certificate, <br />which is attached hereto and made a part hereof by reference as Exhibit "D", stating that wage <br />rates (Exhibit "C") and other factual unit costs supporting the compensation paid by the State for <br />these professional services are accurate, complete, and current. The original contract price and any <br />additions thereto shall be. adjusted to exclude any significant sums by which the State determines <br />the contract price has been increased due to inaccurate, incomplete, or non-current wage rates and <br />other factual unit costs. All such contract adjustments shall be made within one year following the <br />end of this contract. <br /> <br />I <br />r~ <br /> <br />Page 1 of 11 <br />01/26/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.