My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01372
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
PROJC01372
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:44:19 AM
Creation date
10/6/2006 12:21:37 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C010047
Contractor Name
Boyle Engineering Corporation
Contract Type
Grant
Water District
0
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" , <br /> <br />. <br /> <br />. <br /> <br />· Boyle is authorized under this addendum to charge time for inefficiencies related to new software <br />and databases. This could include but is not limited to time identifying a problem, communicating <br />the problem to RTi and the State, and re-executing steps that were completed with software that was <br />subsequently modified. Boyle will make every effort in these situations to efficiently confirm that <br />problems are developer responsibility and turn them over to the State and/or RTi as quickly as <br />possible. Estimate aftime required: 50 hrs. <br /> <br />Budget <br /> <br />Budget for this scope addendum is estimated as follows: <br /> <br />Meg Frantz 45 hrs. @ $95 <br /> <br />$4,275.00 <br />$3,600.00 <br /> <br />Linda Williams 45 hrs. @ $80 <br /> <br />ODe's <br /> <br />270.00 <br /> <br />Total <br /> <br />$8,145.00 <br /> <br />D :\ProjectsICRDSSlAddendum 1 scope. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.