My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01372
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
PROJC01372
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:44:19 AM
Creation date
10/6/2006 12:21:37 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C010047
Contractor Name
Boyle Engineering Corporation
Contract Type
Grant
Water District
0
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-. <br /> <br />. <br /> <br />. <br /> <br />,"'... <br />(,.. <br />.;':, <br /> <br />Deliverables: Memo describing approach and results for the basinwide modeling effort. This memo <br />should describe data issues unique to the Yampa model and include calibration results. Command files <br />and data sets will be delivered. <br /> <br />Task 6 - User's guide for the daily model approach <br /> <br />Purpose: Create a generic user's guide based on the approach selected in Task 3 for developing a daily <br />model from a monthly model, using the method selected in the Yampa basin. <br /> <br />Approach: This task will be undertaken only after written authorization from the State, based on <br />conclusions of Task 4. Write a document describing the steps, protocol, and tools used to create the daily <br />Yampa model. <br /> <br />De/iverables: A generic description of the steps required to develop a daily.model from a monthly <br />model. It is expected to be 3 to 5 pages in length. <br /> <br />Task 7 - Extended data set tasks <br /> <br />Purpose: The purpose of this task is to complete calibration and documentation of the extended <br />historical data set for the Yampa and Colorado River Basin Water Resources Planning Models, and to <br />apply the stochastically generated data set for the Yampa River Basin Model to a specific management <br />alternative. <br /> <br />Approach: This task will be undertaken only after separate written authorization from the State. The <br />Yampa and Colorado models will be calibrated using historical streamflow at key gages and historical <br />contents at key reservoirs. Phase IlIa documentation will be updated to reflect calibration changes, and a <br />new section on data extension will be provided. The monthly Yampa model will be executed under a <br />future scenario specified by the state, and comparisons made with a similar analysis using the historical <br />data set. <br /> <br />Deliverables: Final extended historical data sets for the Yampa and Colorado monthly models, and <br />documentation for the same; a technical memorandum describing the application of the stochastic data <br />set to a sample management problem. <br /> <br />Task 8 - Management and coordination <br /> <br />Purpose: Allow for adequate time to maintain communication with the State and to manage the project. <br /> <br />Approach: Submit monthly progress reports and invoices to the State. Hold two progress meetings over <br />the course of Tasks 1,2,3,4, and 7; hold two to four progress meetings over the course of Tasks 5 and <br />6. <br /> <br />Deliverables: .Monthly progress notes and invoices, minutes from progress meetings. <br />
The URL can be used to link to this page
Your browser does not support the video tag.