Laserfiche WebLink
<br />Delta Canal Company <br />May 23, 2002 <br /> <br />Page 2 <br /> <br />3. You must adhere to the CWCS Desiqn and Construction Administration Procedures. Tim <br />Feehan will contact you regarding the CWCS requirements concerning project bidding, design, <br />and construction. Tim will make construction inspections, which will be the basis of the pay <br />estimates for disbursement of your loan funds. <br /> <br />On behalf of the Soard, I would like to thank you for applying for a Small Project Loan from the <br />Colorado Water ConseNation Soard. <br /> <br />~~ <br /> <br /> <br />Mike Serlet, PE, Chief <br />Water Supply Planning and Finance Section <br />Colorado Water Conservation Soard <br /> <br />Attachments: <br /> <br />Updated Memo: DeltaCana\ 502memo <br /> <br />cc (w/Attachment): <br /> <br />Mr. Keith Catlin, Board Member, Colorado Water Conservation Board <br />CWCB Section B Staff <br />Linda Bassi, AGO <br />Chrono file <br /> <br />c: wp51\Proj-NewlDeltaCanal S021tr <br /> <br />