My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150108 Contract
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
C150108 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2013 10:38:43 AM
Creation date
10/6/2006 12:19:27 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150108
Contractor Name
Delta Canal Company, The
Contract Type
Loan
Water District
40
County
Delta
Bill Number
MC3
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~5" <br /> <br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Shennan Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866.3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.CO.llS <br /> <br /> <br />May 23, 2002 <br /> <br />Bill Owens <br />Governor <br /> <br />Greg E. Walcher <br />Executive Director <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />Mr. Dan Putney, President <br />Delta Canal Company <br />477 1600 Road <br />Delta, CO 81416 <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />RE: Rehabilitation of the Delta Canal <br />Small Project Loan Approval <br /> <br />Dear Mr. Putney, <br /> <br />I am pleased to inform you that the Colorado Water Conservation Board (CWCB) approved your <br />Small Project Loan request on May 20, 2002. The loan is for rehabilitation work on the Delta Canal <br />system. <br /> <br />The Board approved a Small Project Loan from the Construction Fund in a maximum amount of <br />$75,000. The loan terms are 2.75% for 30 years or 2.5% for 20 years, at your option. I have <br />attached a copy of the updated Board memo concerning the Delta Canal Company. Please refer to <br />page 4 of that memo and to the section "Action taken by the CWCB May 20, 2002." <br /> <br />When the Board approved this Small Project Loan it attached several conditions: <br /> <br />1. A Feasibility Studv is reauired. John Van Sciver has reviewed the feasibility study for this <br />project and has determined that, in combination with the CWCB board memo dated May 6, <br />2002, it meets the requirements of the CWCB Construction Fund Guidelines. This office has <br />accepted the study. <br /> <br />2. An approved contract must be in place before funds can be advanced. Jan lIIian has placed <br />this project on our contracting "hot list" and has initiated the loan contracting process. Our goal <br />is to have the loan contract ready for final signature and routing by October 1, 2002, so that <br />loan funds will be available for construction in fall 2002. <br />
The URL can be used to link to this page
Your browser does not support the video tag.