My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01190
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
PROJC01190
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:17:57 AM
Creation date
10/6/2006 12:19:11 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153678
Contractor Name
Lower Arkansas Water Management Association
Contract Type
Loan
Water District
67
County
Prowers
Bill Number
SB 96-124
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />- <br /> <br />,/ <br /> <br />, <br /> <br />, <br /> <br />LOAN CONlRACT <br />Lower Arkansas <br />Water Management Association <br />feasibility Study <br /> <br />~,r""", <br /> <br />"", <br /> <br />~ ~. .~~\ <br /> <br />",' <br /> <br />"_;l):' <br /> <br />NOW THEREFORE, it is hereby agreed that: <br /> <br />That the captions and headings contained in this contract are for convenience and <br />reference only and shall not be construed so as to define or limit the terms or provisions <br />contracted here in. <br /> <br />1. (Borrower's consultant to Prepare Feasibility Report): The Borrower shall <br />have a Feasibility Report prepared on The Project. The State has approved a proposal for <br />the project Feasibility Report prepared by BOlTower's consulting engineer, Duane D. Helton, <br />Helton and Williamsen, P,C. (the Consultant), This proposal is attached hereto as <br />J Appendix A and made a part of this contract. <br /> <br />2. (Final Feasibility Report is due in one year): Three (3) copies of the final report <br />of the Feasibility Study prepared in compliance with the Consultant's proposal, as set forth <br />in Appendix A, shall be furnished to the State not later than one (1) year after the date of <br />this contract, unless such time is extended by mutual agreement of the parties hereto in <br />writing. <br /> <br />3. (The State will Loan the money to do the Feasibility Report): The State shall <br />loan the Borrower the monies to pay for the services of the Borrower's Consultant to <br />prepare the final report of the Feasibility Study. The State shall loan to the Borrower the <br />sum of Shay-Five Thousand Dollars ($65,000) in the manner following: <br /> <br />3a. (Borrower submits statements of costs): Throughout the time of preparation of <br />the Feasibility Study, the Borrower shall prepare, with the assistance of the Consultant <br />referred to in paragraph 1. above, statements of the costs of the Feasibility Study, and <br />shall forward said statements to the State. Said statements shall indicate task( s) upon <br />which work has been performed, and the percentage completion of each task, by task <br />number as specified in Appendix A. ' <br /> <br />3b. (State will pay 95% of each statement costs): Upon receipt and approval by <br />the State of each such statement, the State will, wit~ thirty (30) days from the <br />approval of such statement, pay over to the Borrower ninety five percent (95%) of the <br />amount of the statement or such portion thereof as has been approved by the State. <br /> <br />3c. (State will pay 5% retainage when study is done): The remaining five percent <br />(5%), Three Thousand Two Hundred and Fifty Dollars ($3,250) will be paid t? the <br /> <br />Page 2 of 12 Pages <br /> <br />- . <br />
The URL can be used to link to this page
Your browser does not support the video tag.