My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01092
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
PROJC01092
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2010 11:06:07 AM
Creation date
10/6/2006 12:17:46 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153625
Contractor Name
Dames and Moore
Water District
0
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />.. <br /> <br />. <br /> <br />administration will be thoroughly addressed. It is envisioned that these issues will be the <br />subject of one of the brainstorming sessions. The project team anticipates working closely <br />with the CROSS project management team in further defining, refining and prioritizing the <br />needs of the CRDSS by "walking-through" a number of the previously mentioned problems. <br /> <br />At the end of this task a rich set of problems will have been identified that the CROSS <br />must address. The final product of this task will be a prioritized list of CROSS needs. The <br />list will be delivered to the CROSS Advisory Committee by October 1, 1992. <br /> <br />TASK 2: DETER..'\fINATION OF NEW AJ.'ID EVALUATION OF EXISTING MODELS <br />AND PROCEDURES <br /> <br />Introduction <br /> <br />Successful completion of Task 1 will have provided a significant foundation for the <br />model evaluation task. The goal of Task 2 is to produce an inventory of existing models, <br />tools and procedures that are needed to support the decision-making process in the CROSS. <br />Furthermore, additions or enhancements to existing or new models and/or procedures need <br />to be defined, described, and prioritized. This tasiclVill also address how the CRDSS needs <br />to adapt to future needs as they emerge. <br /> <br />Anmini,;tration <br /> <br />. <br /> <br />Hussam Fahmy will lead this Task, with assistance from Anand Prakash, Edith <br />Zagona and Pedro Restrepo. <br /> <br />Detailed Work Plan <br /> <br />The primary work item in this task will be to evalUate models in the context of the <br />problem descriptions identified in Task 1. The project team will work with the users in <br />documenting solution procedures for each problem. The users will specify the models and <br />procedures they currently use or would like to use in the solution process. <br /> <br />The determination of new and evaluation of existing models and procedures will <br />follow three steps: <br /> <br />. model classification; <br />· model availability survey; and <br />· model evaluation. <br /> <br />Model Classification <br /> <br />All models will be classified according to their characteristics regarding model type <br />and spatial md temporal scales and aggregation levels: <br /> <br />Three subclasses of models will be distinguished: simulation models, optimization <br />. models, or malysis models. <br /> <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.