Laserfiche WebLink
<br />,,' '. <br /> <br />" <br />i , <br />'. <br /> <br />'. <br /> <br />SCHEDULE A <br /> <br />COLORADO WATEH CONSERVATION BOARD <br />CONSTRUCTION FUND PROGRAM PROCEDURES <br /> <br />1. Board dpproval of engineering firm and engineering <br />agreement between engineering firm and project sponsor. <br /> <br />Z. Preparation of detalied plans and specIfications for <br />authorized projects b~ consulting engineering firm. <br /> <br />3. Approval of detailed plans and specifications b~ Board <br />staff (plans and specifications for storage dams and <br />reservoirs must dlso be dpproved by State Engineer's' <br />ottlce). <br /> <br />4. Board staff approval of bIddIng for the project. Board <br />staff present at bid opening ror constructIon. <br /> <br />5. Project sponsor may lssue the notice of award and the <br />notIce to proceed with construction to the contractor <br />(both notice.. mu.t be approved b~ the Board starr before <br />the~ are issued). <br /> <br />6. Conduct a pre-construction conference. Approval of <br />constructIon schedule b~ Board staff. <br /> <br /> B. <br />\ <br />\ <br />I <br />! 9. <br /> 10. <br /> <br />7. Constructlon commences. The Board staff makes periodic <br />inspections durIng construction. All change orders must <br />be dpproved by the Board staff in advance and before dRY <br />constructIon on change lt~ms can commence. Emergency <br />items cleared b~ telephone. . <br /> <br />The consulting engIneer 'certHies that the project has <br />been completed according to approved drawings and <br />specifications and arranges for final Inspection. <br /> <br />Final Inspection and acceptance of as-built project by, <br />BOdrd staff. <br /> <br />Submittal of as-built drawings to Board starf for <br />approval and fiilng. <br /> <br />. ~I . <br /> <br />':-:. ! <br /> <br />,;., <br />