My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01071
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
PROJC01071
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2009 9:26:11 AM
Creation date
10/6/2006 12:17:33 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153594
Contractor Name
Handy Ditch Company
Contract Type
Loan
Water District
4
County
Larimer
Bill Number
HB 91-1006
Loan Projects - Doc Type
Contract Documents
Supplemental fields
Water Division
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />';qrnc <br /> <br />engineers . planne.rs . surveyors <br /> <br />August 21, 1990 <br /> <br />~~.... <br />.. -,.~~ <br />-....... <br /> <br />~fp 27 '90 <br />....,J .", <br />L'j;;"":~(j ~~ ~. <br /><i':""~~.,,,. <br />'. -i;~r- - h <br /> <br />Mr. Louis F. Bein <br />Berthoud National Bank <br />P.O. Box 1079 <br />Berthoud, CO B0513 <br /> <br />RE: Proposal for Engineering Services <br />Rehabilitation of Handy (Welch) Dam West (No.1) Outlet Works <br />Phase I - Feasibility Study; Phase II - Design Report, Plans and <br />Specifications; Phase III - Contract and Construction Services <br /> <br />Dear Mr. Bein: <br /> <br />As requested, we are submitting this proposal to provide engineering <br />services for the repairs of the Handy Reservoir (aka Welch Dam) west (No.1) <br />outlet works. <br /> <br />The Handy Reservoir Company is applying to the Colorado Water <br />Conservation Board (CWCB) for financial assistance for the rehabilitation of <br />the outlet works. <br /> <br />PHASE I - FEASIBILITY STUDY <br /> <br />Rocky Mountain Consultants, Inc. proposes to prepare the feasibility <br />st"dy -".:'red by the Colorado Water Conservation Board in order for the Handy <br />Ditcn CGm~any to receive financial assistance. The requirements of the <br />feasibility study are outlined below. <br /> <br />L <br />amount of <br />length of <br /> <br />Resolution from Handy Ditch Company showing <br />assistance, amount of loans and grants from <br />proposed repayment period (not greater than <br /> <br />project cost, requested <br />other sources, and <br />40 years). <br /> <br />~. ~eneral information, including a project map showing the project <br />features with respect to source of water supply, lands to be served, and <br />nearest towns or cities; a description of the location and climate. <br /> <br />3. Description of the Handy Ditch Company, including: history of the <br />organization, certified copies of articles of incorporation and bylaws; the <br />powers and authorities of the organization with regard to right to eminent <br />domain, taxing or assessing authority, authority to enter into contractual <br />arrangements with the CWCB, and the authority to vest title to the project or <br />a portion thereof in the CWCB; financial status and audit for the latest year <br />(balance sheets already provided will be included in the report); physical <br />assets, age and condition. <br /> <br />4. Description of the land irrigated, classification of soils, service <br />area map, cropping history, and present and future land use. <br /> <br />Rocky Mountain Consultants, Inc. APPENDIX A <br />1960 Industrial Circle. Suite A. Longman!. Colorado 80501 303.772.5282 <br />Offices also in Denver and Estes Park. CO Metro line: 665-6283 Fax No. 665.6959 <br />
The URL can be used to link to this page
Your browser does not support the video tag.