My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01006
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
PROJC01006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2010 11:20:37 AM
Creation date
10/6/2006 12:16:52 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150135
Contractor Name
Silt Water Conservancy District
Contract Type
Loan
Water District
0
County
Garfield
Bill Number
MC3
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 4 - BOARD APPROVAL <br />At its March 2003, meeting, the CWCB approved a loan to the BoRROweR in an <br />amount of $486,000 for up to 90% of the Project costs, plus a 1% loan service charge <br />in the amount of $4,860 a total loan amount of $490,860, with terms of 2.75% per <br />annum for a repayment term of 30 years. <br />SECTION 5— SCHEDULE OF EXISTING DEBT <br />The only outstanding debt of the BORROWER IS 2$100 loan from the CWCB, <br />Contract C150030, 2003. <br />SECTION 6— ADDITIONAL CONDITIONS & CONTRACT REQUIREMENTS <br />There are no additional conditions for this loan. <br />SECTION7 — CONSTRUCTION FUND PROGRAM PROCEDURES <br />A. The BoRROweR shall employ an engineer, registered in the state of Colorado to <br />prepare plans and specifications for the PRO�ecT. <br />B. TF12 BORROWER and the Engineering Consultant's Agreements and the plans and <br />specifications must be submitted to the CWCB staff for verification of compliance <br />with the terms of this Contract when available prior to bidding. Any modifications <br />to the plans and specifications must be approved in writing by the CWCB staff. <br />C. For plans and specifications for all jurisdictional dams and reservoirs, as defined <br />by § 37-87-105 C.R.S., the BoRROweR shall provide a letter of approval from the <br />State Engineer's Office prior to construction. <br />D. CWCB staff must be present at bidding and must approve the award of the <br />construction contract. <br />E. The BoRROwert shall contract for the construction of the work with responsible and <br />capable Construction Firms, which said Construction Firms shall be selected by <br />the BoRROweR and found acceptable by the CWCB staff. <br />F. The BORROWER must provide a copy of the executed construction contract <br />documents consisting of the contractor's proposal, construction contract, <br />performance bond, payment bond, notice of award, notice to proceed, sample <br />change order, and sample field order, as well as the advertisement for bid and bid <br />bond at bidding. After the CWCB staff verifies that these documents comply with <br />the terms of this contract, the BoRROweR may issue the notice to proceed to the <br />Construction Firms. <br />G. The BORROWER Sh811 conduct a pre-construction conference at which time the <br />CWCB staff shall have the opportunity to review and approve the construction <br />schedule. <br />H. If the CWCB staff determines that the PRO�ECr requires a resident inspector <br />construction, the BoRROweR shall employ an inspector who has been approved by <br />the CWCB staff. <br />I. The BORROWER Sh811 construct the PRO�ecr in accordance with the approved <br />plans and specifications. <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.