My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01006
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
PROJC01006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2010 11:20:37 AM
Creation date
10/6/2006 12:16:52 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150135
Contractor Name
Silt Water Conservancy District
Contract Type
Loan
Water District
0
County
Garfield
Bill Number
MC3
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Summary —Silt WCD — Contract No. C150135 <br />SECTION 1 - RORROWER INFORMATION <br />Name: Silt Water Conservancy District <br />Address: P. O. Box 8 <br />Silt, CO 81652 <br />Contact; Scot Dodero, Manager <br />Phone Number: 970-876-2393 Fax Number: 970876-2874 <br />E-mail address: SWCD@rof.net <br />Type of Entity: The Silt Water Conservancy District was formed and <br />decreed under the State of Colorado Water Conservancy <br />Act, (C.R.S. 1953, 149-6-1 to 149-6-43). The BORROWER <br />the Silt Water Conservancy District Water Activity <br />Enterprise, is a water activity enterprise established by the <br />BORROWER by resolution adopted January 14, 2000, <br />pursuant to Article 45.1, Title 37, C.R.S., which resolution is <br />incorporated herein by reference. The enterprise was <br />formed and is operated as an enterprise within the meaning <br />of Co�o. CoNST. Art. X, Section 20. <br />SECTION 2 - PROJECT DESCRIPTION <br />DBSC�IptlOfl Of PROJECT: Th@ BORROWER located in Ga�eld County, applied to the <br />CWCB for a$466,000 foan to be used to replace the pump plant transformer <br />hereinafter referred to as the PRO�ecr. The transformer powers the pump that <br />delivers an average of 4,000 acre-feet per year from the Colorado River to the Pump <br />Canal. The estimated total cost of the PRO�ecr is $540,100. <br />Description of Feasibility Study: The CWCB has reviewed a feasibility study report <br />on th@ PROJECT compiled with assistance from Roy Gearhart, P.E. and David <br />Jankowski, P.E. of the Western Area Power Administration, entitled "Feasibility of <br />Replacement of the Silt Pump Plant Transforme�" dated January 2003, which is <br />incorporated herein by reference, and, based upon the feasibility report, the CWCB <br />determined the PROdecr to be technicafly and financially feasible. <br />SECTION 3 - CWCB'S AUTHORITY <br />Smal/ Proiect Loan: This loan is made pursuant to the provisions of <br />§§37-60-119 and 37-60-120, C.R.S., which authorizes the CWCB to loan money for <br />water projects for the benefit of the people of the State, provided that the borrower <br />assures repayment of that money. <br />Section 37-60-122(1)(b) C.R.S., authorizes the CWCB to make loans of up to <br />$1,000,000 from the CWCB's Construction Fund and the State Severance Tax Trust <br />Fund Perpetual Base Account Fund without prior approval from the General <br />Assembly. <br />Appendix 1 to Loan Contract C150135 <br />
The URL can be used to link to this page
Your browser does not support the video tag.