Laserfiche WebLink
<br />" <br />.~ <br /> <br />. <br />~. <br /> <br />. <br /> <br />. <br /> <br />Extensions of work beyond the estimated duration shown in <br /> <br /> <br />Figure 2 or expansion of the required field activities due to <br /> <br />actions of others shall be a basis for negotiating time and cost <br /> <br />changes, <br /> <br />Services beyond the total cost of $450.000 shall not be <br /> <br />undertaken by the Contractor without ~he prior written <br /> <br />authorization of the State as contained in a supplement to this <br /> <br />contract. as provided herein. <br /> <br />~ <br /> <br />. ~o <br />7 <br /> <br />~ <br /> <br />, <br /> <br />~ <br /> <br />.~ <br /> <br />-4- <br />