Laserfiche WebLink
<br />,- J <br />., <br />"'-\ <br /> <br />. <br /> <br />. <br /> <br />a. The cost of transportation and living expenses of the <br />Contractor~ employees traveling from or to office or <br /> <br />project site incurred in discharge of duties connected <br /> <br />with the Work. <br /> <br />b, The cost of field office, field office furnishing. <br />field office equipment, telep~one and telegraph <br /> <br />services. progress photographs and negatives. postage, <br /> <br />blueprints and reproduction, and office supplies, and <br /> <br />.. <br />other simi-llarr. items incurred by the Contractor in <br />'I" 'r <br />connection.with the Wo~k. <br /> <br />, <br /> <br />" <br /> <br />,', <br /> <br />c. The cost for housihg and temporary duty compensation to <br />" <br /> <br />permanent full-time contractor employees. <br /> <br />d. The cost of field transportation for field inspection staff. <br /> <br />This covers procurement, operation and maintenance of field <br /> <br />transportation, and is planned to include a vehicle for the <br /> <br />Resident Manager. <br /> <br />e; The cost of equipment rentals, safety equipment, materials, <br />and supplies required to plan and perform the Work, <br /> <br />f. The premium costs for Contractor, the provided property, <br /> <br />casualty and liability insurance. including excess and <br /> <br />contingent liability and any losses within the deductibles. <br /> <br />-2- <br />