My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150112 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
C150112 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2009 9:26:07 AM
Creation date
10/6/2006 12:15:59 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150112
Contractor Name
Kern Reservoir and Ditch Company
Contract Type
Loan
Water District
1
County
Weld
Bill Number
MC3
Loan Projects - Doc Type
Feasibility Study
Supplemental fields
Water Division
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ROCKY MOUNTAIN CONSULTANTS, INC. <br /> <br />=lIilC <br /> <br />1900 S. Sunset, Suite 1-F <br />Longmont. CO 80501 <br />(303) 772-5282 <br />FAX (303) 665-6959 <br /> <br />A IDRA TECH COMPANY <br /> <br />August 6, 2002 <br /> <br />Mr. Wayne Miller, President <br />Kern Reservoir and Ditch Company <br />301 Walnut Street <br />Windsor, Colorado 80550 <br /> <br />Re: Windsor Lake, Proposal for Engineering Services <br /> <br />Dear Mr. Miller: <br /> <br />This letter serves as our proposal to provide engineering services for the Windsor Lake excavation and <br />slope liner project. Engineering services to be provided include design and construction related <br />engineering as described in more detail in the following scope of work. <br /> <br />SCOPE OF WORK <br /> <br />Phase 1 - Site Investif!ation <br /> <br />I. Approximately three days of geotechnical drilling is planned for the site. In addition, two days <br />of permeability testing of the bedrock is planned. The test holes will be advanced around the <br />perimeter of the site to sample overburden, sand, gravel, and bedrock. Piezometers will be <br />installed along the south side of the reservoir for the monitoring of groundwater levels, <br />Permeability testing will be conducted using a Packer testing apparatus. <br /> <br />Soil sample collection in the interior of the lake may be possible if the lake is drawn down and <br />access across the soft bottom is developed. We will log and gather test pit samples if access <br />onto the lake bottom is possible and excavator is made available by Hall-Irwin or a <br />subcontractor for geotechnical sampling. An interior lake geotechnical investigation is <br />important to evaluate the suitability of the lake bottom sediment and overburden soils for use in <br />slope liner construction. If the lake is not drawn down in time for this sampling, estimates of the <br />soils will be made based upon the previous lake interior sampling and the proposed sampling <br />along the lake perimeter. <br /> <br />2. Laboratory testing of the soil and bedrock material will be performed to obtain data, including <br />gradations, in-place moisture content, Atterberg limits, and Standard Proctor tests to develop <br />moisture density relationships. Up to two remolded permeability tests will be performed on the <br />soil proposed for use in the slope liner. Strength testing will be conducted to evaluate the <br />strength characteristics of the potential embankment material and embankment foundation. <br /> <br />CIVIL AND ENVIRONMENTAL ENGINEERING' PLANNING <br /> <br />www.rmcco.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.