<br />around the entire lake perimeter to avoid flooding neighboring properties. In addition, a very large <br />pumping facility would be needed to fill the reservoir. <br /> <br />SELECTED ALTERNATIVE <br /> <br />Alternative 2, Lake Bottom Excavation in Conjunction with Earth Fill at an Adjacent Property, was <br />selected as the preferred alternative. This alternative consists of excavated material from the lake <br />bottom to form additional storage. A compacted earth slope liner will be constructed around the <br />excavated area to control seepage. Preliminary drawings of this alternative are included in a pocket at <br />the end of this study. <br /> <br />COST ESTIMATE <br /> <br /> SUB.CONTRACTOR COST COMP ARlSON SHEET <br /> Bid Type: Budget Proposal Project Title: Kern Reservoir <br /> Project Manager: Ed Lafferty Contractor <br />Item Description ofltem Quantity Unit Unit Cost Item Cost <br /> Mobilization I LS $40,300.00 $40 300.00 <br /> Demobilization and Clearin. <br /> Erosion Control <br /> Silt Fence 13,000 LF $1.08 $14,040.00 <br /> Vehicle Trackin. Pad <br /> Tonsoil50% 0! 4''IStrin and Place) 76,980 CY $1.53 $117,779.40 <br /> Strin Tonsoil 6" and Stockoile <br /> Strio Toosoil 6" and Place in Non-Structural Areas <br /> Reolace T onsoil to a Denth of 6" <br /> Cut to Filf7Site)- 230,383 CY $1.02 $234,990.66 <br /> Borrow!Windsor Lake\ 2,823,780 CY $1.25 $3,529,725.00 <br /> Silt and Mnd Cut to Fill On-site <br /> Sand/Gravel Cut to Fill On-site <br /> Dewater Lake I LS $287,500.00 $287,500.00 <br /> Muck ExcavationlChannel Cull 84,053 CY $2.51 $210,973.03 <br /> Pond Liner 450,000 CY $0.94 $423,000.00 <br /> Shane/Grade and Cleanun 1,386,000 SY $0.06 $83,160.00 <br /> Channel Crossin;;- <br /> Load and StoCk;;ile Broken Concrete in Channels 456,000 SF $0.18 $82,080.00 <br /> Demo and Stockoile Concrete Irrio:ation Ditches <br /> Remove Timber Chute in Canal <br /> Earthwork Lavout and SurvevinQ <br /> En;:;;neerina for Reservoir I LS $95,000.00 $95,000.00 <br /> Total Estimated Cost $5,118,548.09 <br /> Deduct for Greenspire Site Work -$234,990.66 <br /> Total Kern Reservoir Cleaning $4,883,557.43 <br /> Potential Gravel Cost Recovery -$400.000.00 <br /> Potential Cost of Kern Reservoir Cleaning $4,483,557.00 <br /> Lot Holding Share 30% of the Cost $1,345,067.00 <br /> Remainin. Balance 70% to Kern $3,138,490.00 <br /> <br />Feasibility Study <br />Kern Reservoir Enlargement <br /> <br />.3- <br /> <br />August 2002 <br />J:\0636_142\Windsor Lake FS.doe <br />