My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153629 Contract
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
C153629 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 10:25:19 AM
Creation date
10/6/2006 12:15:42 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153629
Contractor Name
Colorado River Water Conservation District, The
Contract Type
Loan
Water District
50
County
Grand
Bill Number
SB 87-15
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~~: 1 <br />, <br /> <br />provided, however, if such water or any part thereof remains in <br /> <br />storage in the Reservoir at a time. when no other water is available <br /> <br /> <br />in the Reservoir or an alternate source designated by,the River <br /> <br /> <br />District to enable Denver to accomplish the exchanges contemplated <br /> <br /> <br />hereby, then to the extent needed to effect such exchanges Denver <br /> <br /> <br />shall have the right to demand such water to be released for its <br /> <br />purposes. <br /> <br />10. CONSULTATION WITH DENVER: The River District shall <br /> <br />consult with Denver concerning the selection of the site of the <br /> <br />Reservoir, design criteria, selection of a contractor, and all <br /> <br />plans, specifications, and contract documents related to the <br /> <br />Reservoir. <br /> <br />11. PERMIT CONDITIONS: Mitigation require~ents and costs, <br /> <br />if any, incurred by ~eason of the construction of the Reservoir and <br /> <br />the release of water to the Colo~ado River system shall be paid for <br /> <br /> <br />~ the River Dis~ict. Mitigation requirements-ind-costs; and their <br /> <br /> <br />negotiation, if any, which may be imposed by permitting agencies as <br /> <br /> <br />the result of the use of the Reser70ir to permit exchanges by Denver <br /> <br /> <br />. upstream of the delivery point ot Reservoir water to the Colorado <br /> <br /> <br />River contemplated hereunder shall be the responsibility of and paid <br /> <br />for by Denver. <br />12. ADDITIONAL USES: In addi~ion to the reservation of <br /> <br />use by the River District in paragraph 5 herein, the Reservoir may <br /> <br /> <br />be used by the River District for any other purpose which is <br /> <br />consistent with and not inhibitive or prejudicial to the <br /> <br />accomplis~~ent of the purposes prOvided in paragraph 4 herein. <br />
The URL can be used to link to this page
Your browser does not support the video tag.