My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153629 Contract
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
C153629 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 10:25:19 AM
Creation date
10/6/2006 12:15:42 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153629
Contractor Name
Colorado River Water Conservation District, The
Contract Type
Loan
Water District
50
County
Grand
Bill Number
SB 87-15
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. , <br /> <br />Reservoir. The 85 percent factor is a cumulative total and need not <br /> <br /> <br />be i~ storage at anyone point in time, if releases have been made <br /> <br /> <br />for Denver's use. <br /> <br /> <br />d. For the purposes of this Aqreement, -Firm Annual <br /> <br /> <br />Yield- shall be the amount of water the Reservoir could have <br /> <br /> <br />delivered to Denver's use over the period of the years 1954, 1955, <br /> <br /> <br />and 1956, divided ~ 3; provided it be assumed that the Reservoir <br /> <br /> <br />was full in the year 1953 but w~s drawn down thereafter to deliver <br /> <br /> <br />15,000 acre-feet to Denver for its use in that year, and not more, <br /> <br /> <br />and further assumed that the ma~imum release is limited in anyone <br /> <br /> <br />year to 30,000 acre-feet and the outlet capacity of the Reservoir is <br /> <br /> <br />not less than 300 c.f.s. The Firm Annual Yield will be determined <br /> <br /> <br />after all permits for construction have been obtained and the <br /> <br /> <br />project design completed and suc~ yield as so determined shall then <br /> <br /> <br />re.~ain constant throughout the term of the Lease. and shall be set <br /> <br /> <br />fort~ in" an addendum -to- ell..." Lease-toqether-wilh Lb.. "capacity- <br /> <br /> <br />determined to be necessary to achieve such yield. <br /> <br /> <br />e. Construction of the dam or 1<eservoir shall be. <br /> <br /> <br />deemed to have commenced on the first day on which any work is <br /> <br /> <br />performed by the general contractor at the Reservoir site pursuant <br /> <br /> <br />to a contract which provides for construction and completion of the <br /> <br /> <br />dam, ?rovided the general contractor continues to prosecute the work <br /> <br /> <br />with reasonable diligence. <br /> <br />2. OBLIGATION TO BUILD RESERVOIR: The River District <br /> <br /> <br />shall proceed with diligence to obtain all necessary permits and <br /> <br /> <br />property rights necessary to construct the Reservoir and to <br />
The URL can be used to link to this page
Your browser does not support the video tag.