My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150044 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
C150044 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2009 9:10:06 AM
Creation date
10/6/2006 12:15:11 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150044
Contractor Name
Riverside Reservoir and Land Company
Contract Type
Loan
Water District
1
County
Morgan
Bill Number
HB 00-1419
Loan Projects - Doc Type
Feasibility Study
Supplemental fields
Water Division
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />eWeR Construction Fund Loan Application <br />Form RrvlH'd March 4.1<J98 <br /> <br />5. <br /> <br />Water Right 57,507 acft + refill <br /> <br />Average water diverted per year 11 J, 111 Acre-feel. <br /> <br />I <br /> <br />6. WiIIlhe acquisition of additional water rights be necessary? <br />YES _ NO X, If "YES", please explain: <br /> <br />7. Please list the names and addresses of any technical or legal consultants retained to <br />represent the applicant or to conduct investigations for the proposed project: <br /> <br />NAME <br />Jack Odor, P.E <br /> <br />ADDRESS and PHONE <br />PO Box 974, Ft Morgan, CO 80707 <br /> <br />(970) 867-5298 <br /> <br />8. List any feasibility studies or other investigations that have been completed or are now in <br />progress for lhe proposed project. (Please submit one copy of each completed study with <br />this application): <br />A feasibility study is now underv.ray for this project. Cost estimates in this loan application <br />are from similar recent projects (Sterling No.1, and Jackson Reservoir) <br /> <br />9. What is the estimated cost of the project? Please include eSlimated Engineering costs, and <br />estimated Construction costs, ifk.no\\o1l: <br /> <br />Estimated Engineering Costs: <br />Estimated Construction Costs: <br />Estimated T otaJ Costs: <br /> <br />$13,200 <br /> <br />$360,800 <br /> <br />$374,000 <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.