My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153804 Contract
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
C153804 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2013 11:26:43 AM
Creation date
10/6/2006 12:14:54 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153804
Contractor Name
Left Hand Ditch Company
Contract Type
Loan
Water District
5
County
Boulder
Bill Number
HB 95-1155
Loan Projects - Doc Type
Contract Documents
Supplemental fields
Water Division
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.: <br /> <br />. <br /> <br />. <br /> <br />- < <br /> <br />Consultants can do more work to determine a closer estimate of <br />COS~$, or 41ternative directions, but need direction of the Board <br />before proceeding. The Board directed Mr. McClain to talk to the <br />homeowners about; an alternative, an excavated spillway, and to take <br />samples to determine whether this is a viable alternative. More <br />inforlllation and budget figures will be needed to present to <br />stockholders at the annual meetipq on February 5, 1994. <br /> <br />Jim Dickey from Left Hand Water Pistrict suggested that the Ditch <br />ColIlpany might approach the D1si:rict regarding the purchase of <br />storage by the District to help defray oosts to other shareholders <br />of the ::;piUway project. This would probably be preferable to <br />limiting storage, and would help maintain the value of Left Hand <br />Ditch, whicn might decrease as storage rights diminish. The Ditch <br />Boards reaction to this suggestion was qenerally negative, with <br />some seeing future problems with co-ownerShip. <br /> <br />SOPERINTKNDENT'S REPORT - JESSE 9-ARRISH <br /> <br />~) Jesse presented an estimate of $2,100.00 from Cushman to <br />replace the drop boards on the ~illiamson Ditch with a head~atQ. <br />There was a lengthy discussion of the design, needs, and <br />maintenance of the williamsol1. The Flonrd indicated an <br />unwillingness to spend the money this year, and directed Jesse to <br />clean out the area of conoern, a.nd ~ey will look at a h.ad'1a~e <br />next year. <br /> <br />2) Jesse toured the Left Hand Va:lley Outlet Ditch with Doug Lyle, <br />to qet an estimate of the cost of cleaninq it out. Jim MoKenzie of <br />Valley Excavating also took a look at the area, and will give a <br />bid. <br /> <br />3) AlIens Lake is down 2 feet, ~eft Hand Valley is down 2 fee~, <br />\ the Spurgeon is full. Jesse said he might pull Allens Lake down 4 <br />~feet, take 50 a.f. out of Left Hand Valley, so he can trnnsfer 1000 <br />~ a.f. to Boulder Reservoir in mid February. <br />\ <br />, ~. PRESIDENT I S REPORT - OTHER BUSnrnSS <br /> <br />~~ RiChard Behrmann reported that he has not yet written letters of <br />response to Colorado Division of Wildlife, and aou~der County, on <br />,toissues raised at the December 1993 meeting. <br /> <br />Assessments <br /> <br />The 1994 proposed assessments were discussed. <br /> <br />MOTION: <br /> <br />Charles Lippincott moved to propose an assessment of <br />$7.50 per Gh<1%"e, with a $60.00 m.LnlmWll, to members at the <br />annual meeting. Second by Morley Fentres$. MOTION <br />CARRIED. <br /> <br />D <br />
The URL can be used to link to this page
Your browser does not support the video tag.