My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC00776
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJC00776
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2011 3:25:36 PM
Creation date
10/6/2006 12:13:23 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150096
Contractor Name
Upper Platte and Beaver Canal Company
Contract Type
Loan
Water District
1
County
Morgan
Bill Number
SPL
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />F, Actual construction as called for in the design documents and in change orders <br />approved by the CWCB and the BORROWER, <br /> <br />G, Engineering services for construction management, including design and <br />construction management for CWCS-approved change orders, <br /> <br />H. Interest during completion of the PROJECT pursuant to Paragraph A.2 herein, <br /> <br />I. Legal services for reviewing engineering services contracts, reviewing this contract, <br />reviewing construction contract documents, and for complying with all federal,state, <br />and local regulatory requirements, <br /> <br />SECTION 8 - DISBURSEMENT SCHEDULE <br /> <br />The BORROWER shall prepare a periodic progress report which contains a statement <br />of the PROJECT costs expended for that period and shall forward said statement to <br />the CWCB, After receipt of the periodic progress report from the BORROWER, and <br />review and acceptance of the items therein as eligible expenses as described below, <br />the CWCB will pay to the BORROWER the amount set forth in the report or such <br />portion that has been approved by the CWCB, Such payment shall be made within <br />thirty (30) days from the CWCS's approval of each progress report, <br /> <br />SECT/ON 9- TIME FOR PERFORMANCE <br /> <br />Project Beginning: Upon effective date of this contract <br /> <br />Project Finish: Two years from the effective date of this contract <br /> <br />SECT/ON 10 - Additional Contract Requirements <br /> <br />No other additional contract requirements, <br />
The URL can be used to link to this page
Your browser does not support the video tag.