Laserfiche WebLink
<br />with the terms of this contract when available prior to bidding, Any modifications to <br />the plans and specifications must be approved in writing by the CWCB staff, <br /> <br />C, For plans and specifications for all jurisdictional dams and reseNoirs, as defined by <br />S 37-87-105 C.R.S" the BORROWER shall provide a letter of approval from the State <br />Engineer's Office prior to construction, <br /> <br />0, CWCB staff must be present at bidding and must approve the award of the <br />construction contract. <br /> <br />E, The BORROWER shall contract for the construction of the work with responsible and <br />capable Construction Firms, which said Construction Firms shall be selected by the <br />BORROWER and found acceptable by the CWCB staff. <br /> <br />F, The BORROWER must provide a copy of the executed construction contract <br />documents consisting of the contractor's proposal, construction contract, <br />performance bond, payment bond, notice of award, notice to proceed, sample <br />change order, and sample field order, as well as the advertisement for bid and bid <br />bond at bidding. After the CWCB staff verifies that these documents comply with <br />the terms of this contract, the BORROWER may issue the notice to proceed to the <br />Construction Firms, <br /> <br />G. The BORROWER shall conduct a pre-construction conference at which time the <br />eWCB staff shall have the opportunity to review and approve the construction <br />schedule, <br /> <br />H, If the eWeB staff determines that the PROJECT requires a resident inspector during <br />construction, the BORROWER shail employ an inspector who has been approved by <br />the eWeB staff, <br /> <br />I. The BORROWER shall construct the PROJECT in accordance with the approved plans <br />and specifications, <br /> <br />J, Upon completion of the PROJECT construction, the BORROWER shall provide as-built <br />drawings of the PROJECT to the eWCB staff, or, if required by 937-87-105, e,R.S" <br />the BORRO\i'lTER shall provide the as-built drawings to the State Engineer's Office for <br />approval and filing, <br /> <br />K. Upon completion of the PROJECT construction, the BORROWER shall arrange a final <br />inspection for the eWCB staff, <br /> <br />L. The BORROWER shall pay all of the expenses related to the PROJECT when such bills <br />are due. <br /> <br />SECTION 7 - ELIGIBLE EXPENSES. The following items are eligible for loan disbursements, <br /> <br />A. Preparing final designs and specifications for the PROJECT, <br /> <br />B, Preparing bid and construction contract documents, <br /> <br />e. Preparing environmental assessment or environmental impact statements, and <br />otherwise complying with the Federal National Environmental Policy Act. <br /> <br />0, Complying with all federal, state, and local regulatory requirements, including the <br />obtaining of all required permits, <br /> <br />E, Fish and wildlife mitigation measures required by federal, state, or local laws and <br />regulations, <br />