<br />with the terms of this contract when available prior to bidding, Any modifications to
<br />the plans and specifications must be approved in writing by the CWCB staff,
<br />
<br />C, For plans and specifications for all jurisdictional dams and reseNoirs, as defined by
<br />S 37-87-105 C.R.S" the BORROWER shall provide a letter of approval from the State
<br />Engineer's Office prior to construction,
<br />
<br />0, CWCB staff must be present at bidding and must approve the award of the
<br />construction contract.
<br />
<br />E, The BORROWER shall contract for the construction of the work with responsible and
<br />capable Construction Firms, which said Construction Firms shall be selected by the
<br />BORROWER and found acceptable by the CWCB staff.
<br />
<br />F, The BORROWER must provide a copy of the executed construction contract
<br />documents consisting of the contractor's proposal, construction contract,
<br />performance bond, payment bond, notice of award, notice to proceed, sample
<br />change order, and sample field order, as well as the advertisement for bid and bid
<br />bond at bidding. After the CWCB staff verifies that these documents comply with
<br />the terms of this contract, the BORROWER may issue the notice to proceed to the
<br />Construction Firms,
<br />
<br />G. The BORROWER shall conduct a pre-construction conference at which time the
<br />eWCB staff shall have the opportunity to review and approve the construction
<br />schedule,
<br />
<br />H, If the eWeB staff determines that the PROJECT requires a resident inspector during
<br />construction, the BORROWER shail employ an inspector who has been approved by
<br />the eWeB staff,
<br />
<br />I. The BORROWER shall construct the PROJECT in accordance with the approved plans
<br />and specifications,
<br />
<br />J, Upon completion of the PROJECT construction, the BORROWER shall provide as-built
<br />drawings of the PROJECT to the eWCB staff, or, if required by 937-87-105, e,R.S"
<br />the BORRO\i'lTER shall provide the as-built drawings to the State Engineer's Office for
<br />approval and filing,
<br />
<br />K. Upon completion of the PROJECT construction, the BORROWER shall arrange a final
<br />inspection for the eWCB staff,
<br />
<br />L. The BORROWER shall pay all of the expenses related to the PROJECT when such bills
<br />are due.
<br />
<br />SECTION 7 - ELIGIBLE EXPENSES. The following items are eligible for loan disbursements,
<br />
<br />A. Preparing final designs and specifications for the PROJECT,
<br />
<br />B, Preparing bid and construction contract documents,
<br />
<br />e. Preparing environmental assessment or environmental impact statements, and
<br />otherwise complying with the Federal National Environmental Policy Act.
<br />
<br />0, Complying with all federal, state, and local regulatory requirements, including the
<br />obtaining of all required permits,
<br />
<br />E, Fish and wildlife mitigation measures required by federal, state, or local laws and
<br />regulations,
<br />
|