Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />r(ECEI\jI~U <br /> <br />WORK PLA~ ^~D COST <br />CITY OF RIFLE FEASIbILITY 'REPOIH <br /> <br />~; EI' 0 [) 1975 <br /> <br />COLO. WATER . <br />CQtl:ll;HVATlON BOARD.) <br /> <br />1. General Information: <br /> <br />The existing water report prepared in 1971-72 will be su0plemented to include <br />description of the project as now planned and the phas~ construction schedule. <br />C\ C A project location exhibit will be prepared. ^ reviel' of the project ~lill be <br />L ) made with the local Game, Fish and Parks Office and Soil Conservation Board <br />, \for their input. <br /> <br />Project Engineer <br />Dt'aftsman <br /> <br />6 hI'S. <br />-6 hI'S "", <br /> <br />2. Revie\; of City's budget, vlater revenues, and existing debt: <br /> <br />This \-lill update ilnd verify data in the ex'jsting study. It \-lill also provide <br />new data concerning recent changes in water rates and user charges. <br /> <br />Project Engineer <br /> <br />. 2 hI's. <br /> <br />3. Service Area Hap: <br /> <br />This \"ill update existing maps of the distribution system. <br /> <br />.; <br /> <br />Project Engineer <br />Draftsman <br /> <br />2 hI's. <br />2 hI'S. <br /> <br />4. I-later Requirements: <br /> <br />Update data in existing report and project future City watef requirement. <br />This \-,ill be based on plant production and use records as are available for <br />a period of 5 to 10 years. Population projections will he presented as have <br />been prepared by various agencies. The most feasible projection for basing <br />water plant expansions \-,ill be identified. Investigiltion of \,ater quality <br />at the settling and infiltration pond will be made and its ability to meet <br />projected demands I-/illbe determined. Data on existing vlater rights and an <br />estimate of their safe yeild shall be included. <br /> <br />Project Engineer <br /> <br />. 36 hI's. <br /> <br />5. Plan of Development: <br /> <br />Included in this section vlill be preliminary engineerin~J design ilnd slZlng of. <br />all elements of equipment proposed in Phase One construction. Oatil )'elating to <br />Phuse T~1O \-,ill also be g'iven, but in a more general IJlilnner. This \-,ill include <br />sizing of the pumps und selection of the number of pumps required for relia- <br />bility and flexibility. lIydraulic design data used to size the pumps, pipe <br />nne und control gates I.,ill be given. An assessment of the ~Jeology at the site <br />of the improvements will be given as may effect construction conditions and <br />costs. Pump wet wells will be sized for proposed pump installations and pos- <br />sible future installutions. Structural design criteria of these units l'Iill <br />be included. An analysis of potential flood protection requil'ed vlill be pro- <br />vided, based on an existing Corp of Engineers flood plain study. I~draulic. <br />conditions relating to modifications of the present filter plant \-,ill be shO\m <br />und units and piping will be sized accordingly. The basis for equipment <br />se 1 ect i on ~Ji 11 be 5110\'/11. <br /> <br />;\ <br />