Laserfiche WebLink
<br />Detail~d estimates for the proposed construction cost will be provided. <br />Operation and maintenance costs will also be provided. These costs will <br />be computed as total costs, annual costs and cost per thousand gallons as <br />is appropriate. Computation of annual costs and fund requirements shall <br />be computed based on interest rates and time schedules provided by the <br />Colorado Water Conservation Board. This schedule will include an emer- <br />gency operati ng fund. <br /> <br />~. <br />. <br /> <br />Project Engineer <br /> <br />40 hrs. <br /> <br />7. Project Evaluation: <br /> <br />This section l'lill show l'lhat effect the proposed construction will have on <br />present user charges and present an evaluation of the costs of operation <br />and maintenance on user charges. Typical user's.charges in nearby towns <br />~/i 11 be given. <br /> <br />Project Engi neer <br /> <br />12 hrs. <br /> <br />8. Financial Program: <br /> <br />Jhis chapter will develop a proposed pay-out schedule, based on data pro- <br />vi ded by the l'!ater Board. <br /> <br />Project Engineer <br /> <br />12 hrs. <br /> <br />9. Revie\'1 of draft \vith l~ater Board and City Official, project supervision <br />and administration. <br /> <br />Project 11anager <br /> <br />. 40 hrs. <br /> <br />Cost Summary: <br /> <br />Project Engineer <br />Ci vil Draftsman <br />Project t-1anager <br /> <br />250 hrs. x $18.50 c <br />40 hrs. x 13.50 = <br />40 hrs. x 26.00 ~ <br /> <br />$4,625.00 <br />540.00 <br />1,040.00 <br /> <br />TOTAL <br /> <br />$6,205,00 <br />