My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC00666
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJC00666
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:28:06 AM
Creation date
10/6/2006 12:12:10 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150083
Contractor Name
John Peroulis and Sons Partnership
Contract Type
Loan
Water District
44
County
Moffat
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />and filing. <br /> <br />K. Upon completion of the PROJECT construction, the BORROWER shall arrange a. final <br />inspection for the CWCB staff, <br /> <br />L. The BORROWER shall pay all of the expenses related to the PROJECT when such bills are <br />due, <br /> <br />SECTION 7 . EUGIBLE EXPENSES. The following items 'are eligibie for loan disbursements. <br /> <br />A. Preparing final designs and specifications for the PROJECT. <br /> <br />B, Preparing bid and construction contract documents. <br /> <br />C. Preparing environmental assessment or environmental impact statements, and otherwise complying <br />with the Federal National Environmental Policy Act. <br /> <br />D. Complying with all federal, state, and local regulatory requirements, including the obtaining of ail <br />required permits. . <br /> <br />E. . Fish and wildlife-mitigation-measures required by federal, state, or local laws and regulations.' <br /> <br />F, Actual construction as called for in the design documents and in change orders approved by the <br />CWeB arid the BORROWER. <br /> <br />G. Engineering services for construction management, including design and construction management <br />for CWCB-approved change orders. <br /> <br />H, Interest during completion of the PROJECT pursuant to Paragraph A.2 herein. <br /> <br />l. Legal services for reviewing engineering services contracts. reviewing this contract, reviewing <br />construction contract documents, and for cDmplying with all federal, state, and local regulatory <br />requirements, <br /> <br />SECTION 8 - DISBURSEMENT SCHEDULE <br /> <br />The BORROWER shall prepare a periodic progress report which contains a statement of the PROJECT <br />. costs expended for that period and shall forward said statement to the CWCB. After receipt of the <br />periodic progress report from the BORROWER, and review and acceptance of the items therein as <br />eligible expenses as described below, the CWCS will pay to the BORROWER the amount set forth in the <br />report or such portion that has been approved by the eWCB, Such l*lyment shall be made within <br />thirty (30) days from the CWCS's approval of each progress report. <br /> <br />SECTION 9- TIME FOR PERFORMANCE <br /> <br />Project Beginning: Upon the Effective Date of this contract <br /> <br />Project Finish: 3 years from the Effective Date of this contract <br /> <br />SECTION 10 - Additional Contract Requirements <br /> <br />. As a condition of the eWCB's loan approval, each of the BORROWER'S partners and their spouses <br /> <br />shall co-sign the loan contract and the promissory note. <br />
The URL can be used to link to this page
Your browser does not support the video tag.