Laserfiche WebLink
<br />and incorporated herein, all more particularly described in the attached Deeds of Trust, hereafter <br />referred to as the Collateral. <br /> <br />SECTION 5 - SCHEDULE OF EXISTING DEBT <br /> <br />Lienholder Contract Original Term of Priority <br />Date Amount Repayment <br />Lend Lease Agri-Business February $2,000,000.00 CWCB loan will have senior position <br />6500 S Quebec, Suite 300 17,1999 to the two Lend Lease Agri-Business <br />Englewood CO 80111 ioans. <br />Alln: Vern George October <br />303-694-1115 19,2000 $1,600,000,00 <br /> <br />Lend Lease Agri-Business agreed to subordinate its loan to provide the CWCS loan with first position on <br />the property the Borrower has piedged as collateral as described in Section 4 above. Subordination <br />agreement dated August 15, 2002, recorded. in Moffat County, is attached as Appendix 5 and <br />incorporated herein <br /> <br />SECTION 6 - CONSTRUCTION FUND PROGRAM PROCEDURES <br /> <br />A. The BORROWER shall employ an engineer, registered in the state of Colorado to prepare plans <br />and specifications for the PROJECT, <br /> <br />B. The BORROWER'S and the Engineering Consultant's Agreements and the plans and <br />specifications must be submitted to the CWCB staff for verification of compliance with the <br />terms of this contract when ava"rlable prior to bidding. Any modifications to the plans and <br />specifications must be approved in writing by the CWCB staff. <br /> <br />C. For plans and specifications for all iurisdlctional dams and reservoirs, as defined by !l 37-87- <br />105, C,R.S" the BORROWER shall provide a letter of approval from the State Engineer's Office <br />prior to construction. <br /> <br />D, CWCB staff must be present at bidding and must approve the award of the construction <br />contract. <br /> <br />E. The BORROWER shall contract for the construction of the work with responsible and capable <br />Construction Firms, which said Construction Firms shall be selected by the BORROWER and <br />found acceptable by the CWCB staff, <br /> <br />F, The BORROWER must provide a copy of the executed construction contract documents <br />consisting of the contractor's proposal, construction contract, performance bond, payment <br />bond, notice of award, notice to proceed, sample change order, and sample field order, as well <br />as the advertisement for bid and bid bond at bidding. After the CWCB staff verifies that these <br />documents comply with the terms of this contract, the BORROWER may issue the notice to <br />proceed to the Construction Firms. <br /> <br />G, The BORROWER shall conduct a pre-construction conference at which time the CWCB staff <br />shall have the opportunity to review and approve the construction schedule. <br /> <br />H. If the CWCB staff determines that the PROJECT requires a resident inspector during <br />construction, the BORROWER shall employ an inspector who has been approved by the CWCB <br />staff. <br /> <br />I. The BORROWER shall construct the PROJECT in accordance with the approved plans and <br />specifications, <br /> <br />J. Upon completion of the PROJECT construction, the BORROWER shall provide as-built drawings <br />of the PROJECT to the CWCB staff, or, if required by !l37-87-1Q5, CRS" the BORROWER shall <br />provide the as-built drawings to the State Engineer's Office for approval and filing. <br />