My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC00654
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJC00654
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:44:05 AM
Creation date
10/6/2006 12:12:05 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153680
Contractor Name
Santa Maria Reservoir Company
Water District
0
County
Hinsdale
Bill Number
SB 94-029
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br />\....-tA~ <br /> <br />. <br /> <br />Consulting Engineers and Scientists <br /> <br />May 17, 1994 <br /> <br />Sama Maria Reservoir Company <br />P.O. Box 288 <br />Monte Vi~ta, CO 81144 <br /> <br />File: N931198? <br />Ser: 94-312 <br /> <br />Attention: rvil'. Barry Nelson <br /> <br />Subject: Cost Estimate, Phase I <br />Continental Dam <br />Drilling and Preliminary Stability Analysi:; <br />Hinsdale County, Colorado <br /> <br />Dtar Sir: <br /> <br />As requested by Mr. Bill Paddock, we have obtained a fInn price cost estimate for <br />drilling and testing for the proposed work on Continental Dam from Smith Drilling <br />Company of Grand Junction, Colorado. <br /> <br />Mr. Smith has estimated the drilling costs including mobilization excluding materials <br />at $19,000. This is based on an hourly rate which we believe is more appropriate for this <br />project because of the difficult access and testing. We will use a track mounted drill rig <br />that will be easier to move c.Iown the slopes with minimum construction of access roads. <br />"The following is an estimate of cost for Phase 1. <br /> <br />Drilling (hourly) <br />Geologist <br />Logging and testing 14 days <br />Per Diem <br />Air Fare <br />Stability Analyses <br />Seepage Analyses <br />Report Preparation <br /> <br />$19,000 <br /> <br />Estimated total CO:it: <br /> <br />9,500 <br />1,800 <br />1,000 <br />2,000 <br />3,000 <br />~ <br />$44,300 <br /> <br />The drilling includes 465 to 500 feet of cored hole; 5 holes at specified locations on <br />the dam; each hole will be evaluated for need ba:;cd on the results of the previous borings. <br />Selective intervals will be tested using packer tests and standing or falling head tcsts; <br />approximately four days of testing is included. This cost does not induc.le the cost of a <br />small bulldoler which we should have available to assist moves. If the Santa Maria <br />Reservoir Company could supply cne for the tenn of the project, significant savings co\!1d <br />be realized. <br /> <br />2353 130th Avenue N.E., Suite 200 <br />Bellevue. Washington 98005 <br />Tel: (206) 882-2455 Fax: (206) 883-7555 <br /> <br />Plaza West 9600 S.w. Oak Street. Suite 350 <br />Portland. Oregon 97223 <br />Tel: (503) 244-6922 Fax: (503) 244-6914 <br /> <br />Paoe 2 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.