Laserfiche WebLink
<br />.. <br /> <br />APPENDIX A <br /> <br />".. <br /> <br />Feasibility Study - Repair of Continental Dam. <br /> <br />Task I <br /> <br />Drilling (hourly) <br />Materials <br />Geologist:: <br />Logging and Testing (14 days) <br />Per Diem <br />Air Fare <br /> <br />Subtotal <br /> <br />Task II <br /> <br />Stability Analysis <br /> <br />Task III <br /> <br />Seepage Analysis <br /> <br />Task IV <br /> <br />Feasibility Report Preparation <br /> <br />TOTAL <br /> <br />$ 19,000 <br /> 2,300 <br /> 9,500 <br /> 1,800 <br /> 1.000 <br />$ 33,600 <br /> <br />$ 2,000 <br /> <br />$ 3,000 <br /> <br />$ 8.000 <br /> <br />$ 46.600 <br /> <br />Page 1 of 15 <br />