Laserfiche WebLink
<br />~) <br /> <br />f'~ <br />~t;# <br /> <br />0,<'" <br />."; <br />, <br /> <br />. <br /> <br />. <br /> <br />.'~-- <br /> <br />Recommendation <br /> <br />Staff recommends that the Board recommend to the General Assembly that a grant in <br />the amount of up to $200,000 from the CWCB Construction Fund be made to the El Paso <br />County Water Authority in support of the preparation of a Water Master Plan for El Paso <br />County, The funds shall be appropriated directly to the El Paso County Water Authority on a <br />50% cost sharing basis until the plan is completed. <br /> <br />Attachment: Master Water Plan General Specifications <br /> <br />cc: Peter Evans, Director <br />Dan McAuliffe, Deputy Director <br />Mike Serlet, Chief, CWCB Water Supply Planning and Finance Section <br />Phillip J, Voegtle, El Paso County Water Authority <br /> <br />C:\My Documents\Director Reports\991115g - EI Paso County Proposal <br /> <br />3 <br />