My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153953 Contract
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
C153953 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2010 10:23:09 AM
Creation date
10/6/2006 12:10:06 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153953
Contractor Name
Camp Dresser & McKee
Contract Type
Grant
Water District
0
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /><lIl - . <br /> <br />. <br /> <br />. <br /> <br />for this discharge will be required. Water level data will be recorded during the pumping <br />and recovery phases using a pressure transducer and data logger. Aquifer performance <br />testing results will be reduced and interpreted using industry standard graphical analysis <br />techniques based on the Cooper-Jacob method of analysis. <br /> <br />. An in-well pressure transducer and data logger will be installed in the Phase I bedrock <br />well and operated for a IO-month period outside of the irrigation season. <br /> <br />. The data will be recorded at an hourly interval and normalized to elevation for reporting. <br />After initial installation and confirmation of operation over a two-week start-up period, <br />data will be retrieved on a semi-annual basis. <br /> <br />. This data will be used to analyze water levels as part of Task 44. <br /> <br />Deliverables: <br /> <br />Task 36.2 Phase 1 Denver Basin Region Bedrock Well Construction and Testing Report <br /> <br />. A single Report will be prepared for the Phase I bedrock well constructed in the Denver <br /> <br />Basin Region. <br /> <br />. This memorandum will include the following: <br /> <br />an executive sununary of the Denver Basin Bedrock well construction and testing <br /> <br />a description of the chronology of well construction <br /> <br />drafted geologic well log and well completion diagram <br /> <br />geotechnical laboratory reports <br /> <br />analyzed results of the aquifer performance tests <br /> <br />. All data will be maintained in database format and provided to the State in a format that <br />meets the OSS database standards being developed by another consultant. <br /> <br />. The Report will be provided in draft form for State comment. Following resolution of <br />comments, six paper copies and a CD-ROM containing the TM in both MS-WORD and <br />Adobe Acrobat POF format will be provided as the final deliverable. <br /> <br />Task 51: Phase 1 Project Management and Meetings <br /> <br />Objective: <br /> <br />The objective of this task is to track work accomplished, maintain budget and schedule, and report <br />the status of work activities. An additional objective is to promote communications between the <br />Consultant and the State, and between the Consultant and other SPDSS Consultants. <br /> <br />SPDSS Groundwater SOW, Phase 1 <br /> <br />Page 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.